Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
None (1) ·
58625 (1) ·
Atlantis (1) ·
Boca Raton (1) ·
Boynton Beach (1) ·
Delray Beach (1) ·
Greenacres City (1) ·
New Smyrna Beach (1) ·
North Palm Beach village (1) ·
Palm Beach Gardens (1) ·
Port Orange (1) ·
Royal Palm Beach village (1) ·
Vero Beach (1) ·
Wellington village (1) ·
West Melbourne (1)
'BRANCH OF MIAMI CANAL ' (1) ·
'C-51/WEST PALM BCH CANAL' (1) ·
'Callalisa Creek ' (1) ·
'Drainage Ditch ' (1) ·
'E-4 CANAL ' (1) ·
'Intracoastal Waterway ' (1) ·
'IWW Halifax River ' (1) ·
'IWW Indian River ' (1) ·
'L-30 CANAL ' (1) ·
'LATERAL E DRAIN CANAL ' (1) ·
'LWDD CANAL E-1 ' (1) ·
'LWDD E-1 Canal ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD LATERAL 14 CANAL ' (1) ·
'MANATEE POCKET ' (1) ·
'Thompson River ' (1) ·
'Tide Relief Canal ' (1) ·
'West Palm Beach Canal ' (1)
'10TH AVE NORTH ' (1) ·
'27TH STREET ' (1) ·
'BINKS FOREST DRIVE' (1) ·
'CLINT MOORE RD ' (1) ·
'HORSESHOE POINT RD' (1) ·
'Lake Worth Road ' (1) ·
'MIAMI CANAL ROAD ' (1) ·
'Military Trail ' (1) ·
'MILITARY TRAIL NB ' (1) ·
'MILITARY TRAIL SB ' (1) ·
'MINER RD. ' (1) ·
'NB US-441 (SR-7) ' (1) ·
'PALMETTO PK RD ' (1) ·
'SB US-441 (SR-7) ' (1) ·
'SR-44 ' (1) ·
'SR-656 (17th St.) ' (1) ·
'SR-A1A ' (1) ·
'Willowood Drive ' (1)
704032 (1) ·
790148 (1) ·
790151 (1) ·
790152 (1) ·
880077 (1) ·
885809 (1) ·
890101 (1) ·
930361 (1) ·
930409 (1) ·
930410 (1) ·
930413 (1) ·
934138 (1) ·
934293 (1) ·
934318 (1) ·
934348 (1) ·
934516 (1) ·
934902 (1) ·
934929 (1) ·
934936 (1) ·
934937 (1) ·
934942 (1)
'.21 E of Minton Rd. ' (1) ·
'0.2 Mi E of ANCHOR AVE. ' (1) ·
'0.2 MILE WEST OF US-1 ' (1) ·
'0.3MI E of CONGRESS AVE. ' (1) ·
'0.4 Mi. W of SR-A1A ' (1) ·
'0.7 mi south of PGA Blvd.' (1) ·
'0.9 MI N OF LAKE IDA ROAD' (1) ·
'0.9MI N OF LAKE IDA ROAD ' (1) ·
'0.9MI S OF SR-802 ' (1) ·
'0.9MI W OF MILITARY TRAIL' (1) ·
'2.2MI S OF SR-80 ' (1) ·
'A1A on Singer Island ' (1) ·
'ADJ W SIDE MILITARY TRAIL' (1) ·
'AT US-441 (SOUTHERN BLVD)' (1) ·
'AT US-441 SR-7 ' (1) ·
'Lake Worth Rd. at SR-7 ' (1) ·
'SR-44 - Callalisa Creek ' (1) ·
'SR-44 - Indian River ' (1) ·
'SR-7 & SR-80 intersection' (1) ·
'SR-A1A over Halifax River' (1)
26210226 (1) ·
26243117 (1) ·
26290244 (1) ·
26290245 (1) ·
26332602 (1) ·
26361307 (1) ·
26370131 (1) ·
26375277 (1) ·
26400360 (1) ·
26404695 (1) ·
26404846 (1) ·
26405713 (1) ·
26490902 (1) ·
26494457 (1) ·
27084791 (1) ·
27375640 (1) ·
27384786 (1) ·
28030000 (1) ·
29012564 (1) ·
29014444 (1) ·
29085374 (1)
80022456 (1) ·
80050618 (1) ·
80061936 (1) ·
80065069 (1) ·
80072101 (1) ·
80072169 (1) ·
80074511 (1) ·
80074621 (1) ·
80112778 (1) ·
80120775 (1) ·
80120925 (1) ·
80121251 (1) ·
80121646 (1) ·
80172828 (1) ·
80221680 (1) ·
80240703 (1) ·
80400400 (1) ·
80491520 (1) ·
80541414 (1) ·
80550332 (1) ·
80583172 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1)
Showing below up to 21 results in range #1 to #21.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)