Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'B-19 Canal ' (1) ·
'BRANCH OF MIAMI CANAL ' (1) ·
'C-51/WEST PALM BCH CANAL' (1) ·
'Callalisa Creek ' (1) ·
'Drainage Ditch ' (1) ·
'E-3 CANAL ' (1) ·
'E-4 CANAL ' (1) ·
'Intracoastal Waterway ' (1) ·
'IWW Indian River ' (1) ·
'LATERAL E DRAIN CANAL ' (1) ·
'LWDD CANAL E-1 ' (1) ·
'LWDD E-1 Canal ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'MANATEE POCKET ' (1) ·
'SR-91 TPK-DRAINAGE CANAL' (1) ·
'SR-91 TPK/DRAINAGE CANAL' (1) ·
'Thompson River ' (1)
'10TH AVE NORTH ' (1) ·
'27TH STREET ' (1) ·
'BINKS FOREST DRIVE' (1) ·
'CLINT MOORE RD ' (1) ·
'EB Lake Worth Rd. ' (1) ·
'HORSESHOE POINT RD' (1) ·
'HYPOLUXO ROAD WB ' (1) ·
'Lake Worth Road ' (1) ·
'MIAMI CANAL ROAD ' (1) ·
'Military Trail ' (1) ·
'MINER RD. ' (1) ·
'PALMETTO PK RD ' (1) ·
'SR-44 ' (1) ·
'SR-656 (17th St.) ' (1) ·
'SW 18TH ST WB ' (1) ·
'SW 18TH ST. EB ' (1) ·
'Willow Run Blvd. ' (1) ·
'Willowood Drive ' (1)
704032 (1) ·
790151 (1) ·
790152 (1) ·
796401 (1) ·
880077 (1) ·
885809 (1) ·
890101 (1) ·
930329 (1) ·
930413 (1) ·
934138 (1) ·
934293 (1) ·
934345 (1) ·
934348 (1) ·
934516 (1) ·
934902 (1) ·
934925 (1) ·
934926 (1) ·
934929 (1) ·
934942 (1)
'.21 E of Minton Rd. ' (1) ·
'.2mi W of Clyde Morris Bl' (1) ·
'0.2 Mi E of ANCHOR AVE. ' (1) ·
'0.2 MILE WEST OF US-1 ' (1) ·
'0.3MI E of CONGRESS AVE. ' (1) ·
'0.4 Mi. W of SR-A1A ' (1) ·
'0.7 mi south of PGA Blvd.' (1) ·
'0.9MI W OF MILITARY TRAIL' (1) ·
'0.9MI W OF POWERLINE RD ' (1) ·
'1 Mile East of Jog Rd. ' (1) ·
'1.0MI W OF MILITARY TRAIL' (1) ·
'2.2MI S OF SR-80 ' (1) ·
'ADJ W SIDE MILITARY TRAIL' (1) ·
'AT US-441 (SOUTHERN BLVD)' (1) ·
'AT US-441 SR-7 ' (1) ·
'Lake Worth Rd. at SR-7 ' (1) ·
'SR-44 - Callalisa Creek ' (1) ·
'SR-44 - Indian River ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)