Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BRANCH OF ICWW ' (1) ·
'BRANCH OF MIAMI CANAL ' (1) ·
'CR 712 (Midway Road) ' (1) ·
'CR-712 Midway Road ' (1) ·
'Drainage Ditch ' (1) ·
'E-3 CANAL ' (1) ·
'EL RIO CANAL ' (1) ·
'EPB CANAL C-3 ' (1) ·
'Intracoastal Waterway ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'MANATEE POCKET ' (1) ·
'Misner Branch ' (1) ·
'NORTH FORK ST LUCIE RVR ' (1)
'CR-712 (MIDWAY RD)' (1) ·
'EB Lake Worth Rd. ' (1) ·
'HORSESHOE POINT RD' (1) ·
'JUPITER BEACH RD ' (1) ·
'LE CHALET BLVD ' (1) ·
'LINTON BLVD. ' (1) ·
'Main Trail ' (1) ·
'MIAMI CANAL ROAD ' (1) ·
'NB I-95 (S.R. 9) ' (1) ·
'PALMETTO PK RD ' (1) ·
'PROSPERITY FARMSRD' (1) ·
'SB I-95 (S.R. 9) ' (1) ·
'SR-656 (17th St.) ' (1) ·
'SW 18TH ST ' (1) ·
'Willowood Drive ' (1)
704032 (1) ·
796000 (1) ·
880077 (1) ·
890101 (1) ·
930322 (1) ·
930329 (1) ·
934125 (1) ·
934135 (1) ·
934487 (1) ·
934516 (1) ·
934902 (1) ·
935218 (1) ·
940035 (1) ·
940111 (1) ·
940112 (1)
'.21 E of Minton Rd. ' (1) ·
'0.2 Mi E of ANCHOR AVE. ' (1) ·
'0.2MI E OF A1A ' (1) ·
'0.2MI EAST OF US-1 (SR-5)' (1) ·
'0.2MI S OF DONALD ROSS ' (1) ·
'0.3MI W OF OLD DIXIE HWY.' (1) ·
'0.4 Mi. W of SR-A1A ' (1) ·
'0.8 Mile West of Nova Rd ' (1) ·
'0.8Mi W OF MILITARY TRAIL' (1) ·
'1 Mile East of Jog Rd. ' (1) ·
'1MI W of US-1 ' (1) ·
'2.2MI S OF SR-80 ' (1) ·
'ADJ W SIDE MILITARY TRAIL' (1) ·
'I-95 over Midway Road ' (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 15 results in range #1 to #15.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)