Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CPB20 CANAL ' (1) ·
'DANFORTH CREEK ' (1) ·
'E-3 CANAL ' (1) ·
'El Rio Canal E-4 ' (1) ·
'Horse Creek ' (1) ·
'I-95 ' (1) ·
'Indian River EastRelief ' (1) ·
'Indian River IWW ' (1) ·
'Indian River Relief ' (1) ·
'Lake Worth Relief ' (1) ·
'Lateral A Canal ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'PGA Blvd SR 786 ' (1) ·
'RELIEF CANAL ' (1) ·
'SR 786 PGA Blvd ' (1) ·
'SWEETIE SLOUGH ' (1) ·
'Taylor Creek ' (1) ·
'Turkey Creek ' (1) ·
'Turnpike (SR-91) ' (1) ·
Zoo Trail (1)
'45th Street CR-702' (1) ·
'57th Street ' (1) ·
'Blue Heron Blvd ' (1) ·
'Croton Road ' (1) ·
'Dunn Avenue ' (1) ·
'GOLDFINCH LANE ' (1) ·
'I 95 NB SR 9 ' (1) ·
'Juanita Ave. ' (1) ·
'PIONEER ROAD ' (1) ·
'Port Malabar Bl EB' (1) ·
'SB I 95 SR 9 ' (1) ·
'SPARROW DRIVE ' (1) ·
'SR-808 (Glades Rd)' (1) ·
'SUNSET TRAIL ' (1) ·
'SW GREENRIDGE LANE' (1) ·
'US 192 WB ' (1) ·
'US-192 ' (1) ·
'US-192 EB ' (1) ·
'US-192 WB ' (1) ·
'WB Lake Worth Rd. ' (1) ·
Pineda Causeway (1)
700172 (1) ·
700174 (1) ·
700226 (1) ·
700233 (1) ·
700234 (1) ·
700235 (1) ·
704102 (1) ·
705910 (1) ·
794189 (1) ·
884093 (1) ·
894031 (1) ·
894049 (1) ·
930319 (1) ·
930328 (1) ·
930335 (1) ·
930336 (1) ·
930545 (1) ·
934166 (1) ·
934221 (1) ·
937354 (1) ·
937360 (1) ·
944017 (1)
.1 Mi E of I-95 (1) ·
'0.1MI N OF SANDPIPER AVE.' (1) ·
'0.1Mi W of US-1 ' (1) ·
'0.2 Miles East of US-1 ' (1) ·
'0.3MI W OF RYL PALM BH BL' (1) ·
'0.6MI S of SW96 ST(CR76A)' (1) ·
'0.7MI WEST OF MAPP ROAD ' (1) ·
'1.0 M West of Haverhill R' (1) ·
'1.4 miles east of I-95 ' (1) ·
'1.6 miles East of SR-507 ' (1) ·
'1.7 Miles N of Aurora Rd.' (1) ·
'1mi. east of Jog Rd. ' (1) ·
'1mi. N of North Lake Blvd' (1) ·
'1mi. N of Northlake Blvd.' (1) ·
'2.0 MI N of US-92 on I-95' (1) ·
'82FT EAST OF SR-7 ' (1) ·
'At CR-615 (66th Ave.) ' (1) ·
'SR-A1A East of ICWW ' (1) ·
'US 192 WB over Indian Riv' (1) ·
'US-192 - Indian River Rel' (1) ·
'US-192 EB - Indian Riv ' (1) ·
'US-192 WB-Indian River ' (1)
26214420 (1) ·
26370912 (1) ·
26401668 (1) ·
26415887 (1) ·
26421675 (1) ·
26453630 (1) ·
26470126 (1) ·
26502240 (1) ·
26502290 (1) ·
27044705 (1) ·
27100650 (1) ·
27282250 (1) ·
27415031 (1) ·
28010115 (1) ·
28045218 (1) ·
28050339 (1) ·
28051366 (1) ·
28051434 (1) ·
28051925 (1) ·
28094049 (1) ·
28113400 (1) ·
29115274 (1)
80022352 (1) ·
80054930 (1) ·
80060655 (1) ·
80060720 (1) ·
80074786 (1) ·
80080080 (1) ·
80120806 (1) ·
80131759 (1) ·
80140096 (1) ·
80165077 (1) ·
80183914 (1) ·
80201872 (1) ·
80274502 (1) ·
80343718 (1) ·
80345659 (1) ·
80345692 (1) ·
80352988 (1) ·
80354573 (1) ·
80355880 (1) ·
80391970 (1) ·
80422199 (1) ·
81054486 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the culvert. Insignificant scrape marks caused by drift. (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 22 results in range #1 to #22.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)