Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Banana River ' (1) ·
'Canal 29 (5 mile creek) ' (1) ·
'Canal C-51 ' (1) ·
'CPB20 CANAL ' (1) ·
'DANFORTH CREEK ' (1) ·
'Drainage Ditch ' (1) ·
'El Rio Canal E-4 ' (1) ·
'Goat Creek ' (1) ·
'I-4 ' (1) ·
'I-95 ' (1) ·
'Indian River Relief ' (1) ·
'KELLER (E-4) CANAL ' (1) ·
'L-5 Canal ' (1) ·
'Lateral "B" Canal ' (1) ·
'Lateral B Canal ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'LWDD E-4 Canal ' (1) ·
'LWDD E3 Canal ' (1) ·
'Moore's Creek ' (1) ·
'RELIEF CANAL ' (1) ·
'SWEETIE SLOUGH ' (1)
'1st St SW ' (1) ·
'2nd AVENUE NORTH ' (1) ·
'5th Street ' (1) ·
'CR-612 8th Street ' (1) ·
'Enterprise Rd. ' (1) ·
'GOLDFINCH LANE ' (1) ·
'Investment Lane ' (1) ·
'Levee Road ' (1) ·
'Linton Blvd. ' (1) ·
'LittleRanchesTrail' (1) ·
'N 13th Street ' (1) ·
'PIONEER ROAD ' (1) ·
'SPARROW DRIVE ' (1) ·
'Spotted Fawn Way ' (1) ·
'SR 68 (Orange Ave)' (1) ·
'SR-520 ' (1) ·
'SR-808 (Glades Rd)' (1) ·
'SUNSET TRAIL ' (1) ·
'SW GREENRIDGE LANE' (1) ·
'US-192 ' (1) ·
'Valkaria Road ' (1) ·
'Woolbright Road ' (1)
700172 (1) ·
700208 (1) ·
704095 (1) ·
704203 (1) ·
790191 (1) ·
884069 (1) ·
884072 (1) ·
884073 (1) ·
894031 (1) ·
894049 (1) ·
930319 (1) ·
930802 (1) ·
930803 (1) ·
934162 (1) ·
934221 (1) ·
934364 (1) ·
934986 (1) ·
934989 (1) ·
935920 (1) ·
937354 (1) ·
937360 (1) ·
940152 (1) ·
945009 (1)
'0.1MI N OF SANDPIPER AVE.' (1) ·
'0.2 Miles East of US-1 ' (1) ·
'0.3Mi N of Orange Ave. ' (1) ·
'0.3MI W OF RYL PALM BH BL' (1) ·
'0.5 E of Military Trail ' (1) ·
'0.5 MI. W of Military Tr ' (1) ·
'0.5 Mile West of I-95 ' (1) ·
'0.5Mi E of SR807 Congress' (1) ·
'0.6 Mile West of US-27 ' (1) ·
'0.6MI S of SW96 ST(CR76A)' (1) ·
'0.7MI WEST OF MAPP ROAD ' (1) ·
'1 mi. east I-95 on SR 68 ' (1) ·
'1.4 miles east of I-95 ' (1) ·
'2.5 Miles West of US-1 ' (1) ·
'20ft. E of 58th Ave/CR613' (1) ·
'30ft. E of 58th Ave/CR613' (1) ·
'6.0 Mi. West of US-27 ' (1) ·
'82FT EAST OF SR-7 ' (1) ·
'At 58th Ave ' (1) ·
'At Lake Washington Rd ' (1) ·
'Enterprise Rd. Over I-4 ' (1) ·
'South Side of US-98 ' (1) ·
'SR-520 - Banana River ' (1)
26200070 (1) ·
26200200 (1) ·
26214420 (1) ·
26262244 (1) ·
26304669 (1) ·
26370900 (1) ·
26401668 (1) ·
26405072 (1) ·
26415887 (1) ·
26421675 (1) ·
26475245 (1) ·
27044705 (1) ·
27100650 (1) ·
27265100 (1) ·
27270318 (1) ·
27354128 (1) ·
27360764 (1) ·
27370020 (1) ·
27571293 (1) ·
28045218 (1) ·
28085200 (1) ·
28212680 (1) ·
28531327 (1)
80045781 (1) ·
80054930 (1) ·
80055081 (1) ·
80055517 (1) ·
80075312 (1) ·
80120806 (1) ·
80131759 (1) ·
80134871 (1) ·
80140096 (1) ·
80165077 (1) ·
80183914 (1) ·
80201436 (1) ·
80222800 (1) ·
80264839 (1) ·
80264892 (1) ·
80264917 (1) ·
80324800 (1) ·
80342637 (1) ·
80355880 (1) ·
80380610 (1) ·
80393654 (1) ·
80424100 (1) ·
81164575 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the culvert. Insignificant scrape marks caused by drift. (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 23 results in range #1 to #23.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)