Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BOYNTON CANAL ' (1) ·
'C-51 W.P.B. CANAL ' (1) ·
'CANAL C-17 ' (1) ·
'CPB20 CANAL ' (1) ·
'CR 812 LANTANA RD ' (1) ·
'E-3 CANAL ' (1) ·
'El Rio Canal E-4 ' (1) ·
'Intracoastal Waterway ' (1) ·
'ITCWD CANAL #1 ' (1) ·
'ITCWD CANAL #2 ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'LWDD L-30 CANAL ' (1) ·
'N. NEW RIVER CANAL ' (1) ·
'PGA Blvd SR 786 ' (1) ·
'RELIEF CANAL ' (1) ·
'S-5 Discharge Canal ' (1) ·
'SR 786 PGA Blvd ' (1)
'CRESTWOOD BLVD ' (1) ·
'CRESTWOOD BLVD. ' (1) ·
'DONALD ROSS RD WB ' (1) ·
'EB SR706 ' (1) ·
'GOLDFINCH LANE ' (1) ·
'I 95 NB SR 9 ' (1) ·
'JOG ROAD SB ' (1) ·
'Levee Road ' (1) ·
'LYONS ROAD ' (1) ·
'OKEELANTA RD. ' (1) ·
'PARK AVE. W. ' (1) ·
'PIONEER ROAD ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SPARROW DRIVE ' (1) ·
'SR-808 (Glades Rd)' (1) ·
'SR91 NB TPK 91.26 ' (1) ·
'SR91 SB TPK 91.26 ' (1) ·
'US-98 SR700 US441 ' (1) ·
'WB Lake Worth Rd. ' (1) ·
'WB SR 706 ' (1)
930319 (1) ·
930328 (1) ·
930335 (1) ·
930336 (1) ·
930453 (1) ·
930454 (1) ·
930465 (1) ·
930811 (1) ·
931002 (1) ·
931003 (1) ·
934160 (1) ·
934164 (1) ·
934221 (1) ·
934294 (1) ·
934296 (1) ·
934522 (1) ·
934938 (1) ·
934953 (1) ·
937354 (1) ·
937360 (1)
'0.1MI N OF SANDPIPER AVE.' (1) ·
'0.1MI S OF OKEECHOBEE BL ' (1) ·
'0.3MI W OF CONGRESS AVE ' (1) ·
'0.3MI W OF RYL PALM BH BL' (1) ·
'0.6MI S OF OKEECHOBEE BLV' (1) ·
'0.7MI N OF BOYNTON BCH BL' (1) ·
'0.8MI WEST OF US-1 ' (1) ·
'1.4 miles east of I-95 ' (1) ·
'1.9Mi S of WOOLBRIGHT ' (1) ·
'1mi. east of Jog Rd. ' (1) ·
'1mi. N of North Lake Blvd' (1) ·
'1mi. N of Northlake Blvd.' (1) ·
'2.1 M S OF LAKEWORTH INTR' (1) ·
'2.1MI S LAKEWORTH INTERCH' (1) ·
'21.0 Mi North of US-27 ' (1) ·
'82FT EAST OF SR-7 ' (1) ·
'AT US-27 ' (1) ·
'Indiantown Rd./ICW ' (1) ·
'Indiantown Rd/ ICW ' (1) ·
'SR-700 CANAL POINT ' (1)
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 20 results in range #1 to #20.