Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'ARCHIES CREEK ' (1) ·
'BOYNTON CANAL ' (1) ·
'CANAL E-4 ' (1) ·
'Canal No. 1 (Rim Canal) ' (1) ·
'CPB20 CANAL ' (1) ·
'Danforth Creek ' (1) ·
'Drainage Ditch ' (1) ·
'E-3 CANAL ' (1) ·
'E3 CANAL ' (1) ·
'FLORIDA TURNPIKE ' (1) ·
'JONES CREEK ' (1) ·
'KELLER CANAL ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'PGA Blvd SR 786 ' (1) ·
'RELIEF CANAL ' (1) ·
'RETENTION POND ' (1) ·
'ROEBUCK CREEK ' (1) ·
'SIMS CREEK ' (1) ·
'SR 786 PGA Blvd ' (1) ·
'SR-70 (Okeechobee Rd.) ' (1) ·
'SWEETIE SLOUGH ' (1) ·
'Turkey Creek ' (1)
'BELVEDERE ROAD ' (1) ·
'BUCKSKIN TRAIL ' (1) ·
'CENTER DRIVE ' (1) ·
'CENTER STREET ' (1) ·
'DYER PARK ROAD ' (1) ·
'EB SR - 714 ' (1) ·
'GOLDFINCH LANE ' (1) ·
'I 95 NB SR 9 ' (1) ·
'JOG ROAD (NB) ' (1) ·
'LAKE IDA ROAD ' (1) ·
'McClure Road ' (1) ·
'NB SR-9 (I-95) ' (1) ·
'NORTHLAKE BLVD(EB)' (1) ·
'NORTHLAKE BLVD(WB)' (1) ·
'PIONEER ROAD ' (1) ·
'Port Malabar Bl EB' (1) ·
'PROSPERITY FARM RD' (1) ·
'SB I 95 SR 9 ' (1) ·
'SB SR-9 ( I-95) ' (1) ·
'SPARROW DRIVE ' (1) ·
'Spotted Fawn Way ' (1) ·
'SW GREENRIDGE LANE' (1) ·
'WB Lake Worth Rd. ' (1)
704203 (1) ·
705910 (1) ·
890134 (1) ·
894049 (1) ·
894051 (1) ·
930328 (1) ·
930335 (1) ·
930336 (1) ·
934137 (1) ·
934140 (1) ·
934146 (1) ·
934147 (1) ·
934148 (1) ·
934149 (1) ·
934221 (1) ·
934282 (1) ·
934357 (1) ·
934951 (1) ·
934964 (1) ·
934965 (1) ·
936701 (1) ·
937354 (1) ·
937360 (1) ·
940101 (1) ·
940102 (1)
'0.1MI N OF SANDPIPER AVE.' (1) ·
'0.1MI W of HAVERHILL RD. ' (1) ·
'0.3MI E OF CONGRESS ' (1) ·
'0.3MI W OF RYL PALM BH BL' (1) ·
'0.5 MILE WEST OF JOG RD ' (1) ·
'0.6MI NE OF INDIANTOWN RD' (1) ·
'0.6MI S of SW96 ST(CR76A)' (1) ·
'0.7MI N OF BOYNTON BEACH ' (1) ·
'0.8MI E of INDIANTOWN RD ' (1) ·
'0.9 MILE N OF PGA BLVD. ' (1) ·
'1.1 MI E OF JOG ROAD ' (1) ·
'1.5MI W OF MILITARY TRAIL' (1) ·
'1.6 miles East of SR-507 ' (1) ·
'150ft. W of WILDWOOD DR ' (1) ·
'1MI SW OF US-441 ' (1) ·
'1mi. east of Jog Rd. ' (1) ·
'1mi. N of North Lake Blvd' (1) ·
'1mi. N of Northlake Blvd.' (1) ·
'2.5 mi East of TPK Exit ' (1) ·
'2mi S of SR-68(Orange Av)' (1) ·
'82FT EAST OF SR-7 ' (1) ·
'At Lake Washington Rd ' (1) ·
'IN JOHN PRINCE PARK ' (1)
26281579 (1) ·
26281595 (1) ·
26322077 (1) ·
26364799 (1) ·
26370912 (1) ·
26401668 (1) ·
26413216 (1) ·
26415887 (1) ·
26421675 (1) ·
26470845 (1) ·
26481006 (1) ·
26483417 (1) ·
26483495 (1) ·
26502240 (1) ·
26502290 (1) ·
26512989 (1) ·
26562633 (1) ·
26562955 (1) ·
27044705 (1) ·
27062187 (1) ·
27101997 (1) ·
27245645 (1) ·
27245841 (1) ·
28010115 (1) ·
28085200 (1)
80041852 (1) ·
80045351 (1) ·
80051796 (1) ·
80060655 (1) ·
80060720 (1) ·
80070561 (1) ·
80071243 (1) ·
80071351 (1) ·
80074786 (1) ·
80075060 (1) ·
80075215 (1) ·
80075217 (1) ·
80084971 (1) ·
80092158 (1) ·
80120806 (1) ·
80131759 (1) ·
80140096 (1) ·
80161483 (1) ·
80161911 (1) ·
80183914 (1) ·
80231716 (1) ·
80231922 (1) ·
80354573 (1) ·
80402996 (1) ·
80424100 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 25 results in range #1 to #25.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)