Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BRANCH OF ICWW ' (1) ·
'C STANLEY WEAVER CANAL ' (1) ·
'CPB20 CANAL ' (1) ·
'E-3 CANAL ' (1) ·
'El Rio Canal E-4 ' (1) ·
'I-95 ' (1) ·
'ICWW ' (1) ·
'LOXAHATCHEE RIV NW FORK ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'M-2 CANAL ' (1) ·
'RELIEF CANAL ' (1) ·
'ROEBUCK CREEK ' (1) ·
'SCOTTS CANAL ' (1) ·
'SR-70 (Okeechobee Rd.) ' (1) ·
'SR-91 (Florida Turnpike)' (1) ·
'SWEETIE SLOUGH ' (1) ·
'Sykes Creek ' (1) ·
'Turkey Creek ' (1) ·
'WARNER CREEK ' (1)
'GOLDFINCH LANE ' (1) ·
'HAGEN RANCH ROAD ' (1) ·
'ISLAND WAY ' (1) ·
'JUPITER ISLAND PK ' (1) ·
'LOCKS ROAD ' (1) ·
'LPGA Blvd ' (1) ·
'MONET ROAD ' (1) ·
'NB SR-9 (I-95) ' (1) ·
'OKEECHOBEE BLVD. ' (1) ·
'PIONEER ROAD ' (1) ·
'Port Malabar Bl EB' (1) ·
'Port St. Lucie Bld' (1) ·
'SPARROW DRIVE ' (1) ·
'SR-520 ' (1) ·
'SR-60 ' (1) ·
'SR-808 (Glades Rd)' (1) ·
'SW GREENRIDGE LANE' (1) ·
'TROPICALIA AVE. ' (1) ·
'WB Lake Worth Rd. ' (1)
700193 (1) ·
705910 (1) ·
790171 (1) ·
880087 (1) ·
894044 (1) ·
894049 (1) ·
894050 (1) ·
894052 (1) ·
930319 (1) ·
930328 (1) ·
934126 (1) ·
934221 (1) ·
934240 (1) ·
934950 (1) ·
936551 (1) ·
937354 (1) ·
937360 (1) ·
940102 (1) ·
940142 (1)
'0.1MI N OF SANDPIPER AVE.' (1) ·
'0.1MI W OF SEM PRATT WHIT' (1) ·
'0.2Mi E of CR-723 ' (1) ·
'0.2MI E OF PROSPERITY FM ' (1) ·
'0.3MI W OF RYL PALM BH BL' (1) ·
'0.5MI N OF JUPITER BCH RD' (1) ·
'0.5Mi N of PLMBCH CO LINE' (1) ·
'0.5Mi W of SR-76 ' (1) ·
'0.6MI S of SW96 ST(CR76A)' (1) ·
'0.6Mi. W of SR-A1A ' (1) ·
'0.8MI N OF BOYNTON BCH BD' (1) ·
'1.4 miles east of I-95 ' (1) ·
'1.6 miles East of SR-507 ' (1) ·
'1mi. east of Jog Rd. ' (1) ·
'2mi S of SR-68(Orange Av)' (1) ·
'82FT EAST OF SR-7 ' (1) ·
'LPGA Blvd. at I-95 ' (1) ·
'Port St Lucie / FL TPK. ' (1) ·
'SR-520 - Sykes Creek ' (1)
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 19 results in range #1 to #19.