Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C STANLEY WEAVER CANAL ' (1) ·
'CPB20 CANAL ' (1) ·
'Danforth Creek ' (1) ·
'Drainage Ditch ' (1) ·
'E-3 CANAL ' (1) ·
'EL RIO CANAL ' (1) ·
'I-95 ' (1) ·
'L-5 Canal ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'M-2 CANAL ' (1) ·
'MAIN RELIEF CANAL ' (1) ·
'PGA Blvd SR 786 ' (1) ·
'RELIEF CANAL ' (1) ·
'ROEBUCK CREEK ' (1) ·
'SR 786 PGA Blvd ' (1) ·
'SR-70 (Okeechobee Rd.) ' (1) ·
'SR-91 (Florida Turnpike)' (1) ·
'SWEETIE SLOUGH ' (1) ·
'Sykes Creek ' (1) ·
'Turkey Creek ' (1) ·
'WARNER CREEK ' (1)
'CAMINO REAL ' (1) ·
'CR-611 43RD AVE. ' (1) ·
'EB SR - 714 ' (1) ·
'GOLDFINCH LANE ' (1) ·
'HAGEN RANCH ROAD ' (1) ·
'I 95 NB SR 9 ' (1) ·
'LOCKS ROAD ' (1) ·
'LPGA Blvd ' (1) ·
'NB SR-9 (I-95) ' (1) ·
'NB US-27 SR-25 ' (1) ·
'OKEECHOBEE BLVD. ' (1) ·
'PIONEER ROAD ' (1) ·
'Port Malabar Bl EB' (1) ·
'Port St. Lucie Bld' (1) ·
'SB I 95 SR 9 ' (1) ·
'SB SR-9 ( I-95) ' (1) ·
'SPARROW DRIVE ' (1) ·
'Spotted Fawn Way ' (1) ·
'SR-520 ' (1) ·
'SW GREENRIDGE LANE' (1) ·
'TROPICALIA AVE. ' (1) ·
'WB Lake Worth Rd. ' (1)
700193 (1) ·
704203 (1) ·
705910 (1) ·
790171 (1) ·
884056 (1) ·
890134 (1) ·
894049 (1) ·
894050 (1) ·
894052 (1) ·
930328 (1) ·
930335 (1) ·
930336 (1) ·
930353 (1) ·
934221 (1) ·
934240 (1) ·
934950 (1) ·
934960 (1) ·
937354 (1) ·
937360 (1) ·
940101 (1) ·
940102 (1) ·
940142 (1)
'0.1MI N OF SANDPIPER AVE.' (1) ·
'0.1MI W OF SEM PRATT WHIT' (1) ·
'0.2Mi E of CR-723 ' (1) ·
'0.3MI W OF RYL PALM BH BL' (1) ·
'0.4 MI W of US-1 ' (1) ·
'0.5Mi W of SR-76 ' (1) ·
'0.6MI S of SW96 ST(CR76A)' (1) ·
'0.8MI N OF BOYNTON BCH BD' (1) ·
'1.6 miles East of SR-507 ' (1) ·
'1mi. east of Jog Rd. ' (1) ·
'1mi. N of North Lake Blvd' (1) ·
'1mi. N of Northlake Blvd.' (1) ·
'2.5 mi East of TPK Exit ' (1) ·
'250ft North of SR-60 ' (1) ·
'2mi S of SR-68(Orange Av)' (1) ·
'82FT EAST OF SR-7 ' (1) ·
'At Lake Washington Rd ' (1) ·
'LPGA Blvd. at I-95 ' (1) ·
'Palm Beach - Broward Line' (1) ·
'Port St Lucie / FL TPK. ' (1) ·
'SR-520 - Sykes Creek ' (1)
26200920 (1) ·
26203857 (1) ·
26322054 (1) ·
26370912 (1) ·
26401668 (1) ·
26415887 (1) ·
26421675 (1) ·
26422645 (1) ·
26502240 (1) ·
26502290 (1) ·
27044705 (1) ·
27060944 (1) ·
27101997 (1) ·
27134072 (1) ·
27162224 (1) ·
27245645 (1) ·
27245841 (1) ·
27382201 (1) ·
28010115 (1) ·
28085200 (1) ·
28212603 (1) ·
29131187 (1)
80054960 (1) ·
80060655 (1) ·
80060720 (1) ·
80074786 (1) ·
80095067 (1) ·
80120806 (1) ·
80131759 (1) ·
80140096 (1) ·
80140376 (1) ·
80161483 (1) ·
80162515 (1) ·
80183914 (1) ·
80184167 (1) ·
80213032 (1) ·
80231716 (1) ·
80231922 (1) ·
80254872 (1) ·
80321860 (1) ·
80354573 (1) ·
80404702 (1) ·
80424100 (1) ·
81061122 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 22 results in range #1 to #22.