Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-15 Canal ' (1) ·
'CPB20 CANAL ' (1) ·
'CSX Railroad ' (1) ·
'DANFORTH CREEK ' (1) ·
'E-1 CANAL ' (1) ·
'E-1-E CANAL ' (1) ·
'Eau-Gallie River ' (1) ·
'El Rio Canal E-4 ' (1) ·
'F.P.F.W.C.D. Canal No. 1' (1) ·
'I-4 ' (1) ·
'I-95 (SR-9) ' (1) ·
'Indian River Relief ' (1) ·
'L-14 CANAL ' (1) ·
'L-5 CANAL ' (1) ·
'LATERAL CANAL L-5 ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'M CANAL ' (1) ·
'RELIEF CANAL ' (1) ·
'SFWMD C-51 CANAL ' (1) ·
'SHAWANO DRAINAGE DITCH ' (1) ·
'SWEETIE SLOUGH ' (1) ·
Indian River Relief East (1)
'BOB W RD 130TH ST.' (1) ·
'BROWNS FARM/CR-827' (1) ·
'GOLDFINCH LANE ' (1) ·
'JOG ROAD ' (1) ·
'JOG ROAD (NB) ' (1) ·
'JOG ROAD (SB) ' (1) ·
'MARINA BLVD. ' (1) ·
'NB I 95 SR 9 ' (1) ·
'Peninsula Corp Dr ' (1) ·
'PIONEER ROAD ' (1) ·
'Saxon Blvd WB ' (1) ·
'SB I 95 to Cong Av' (1) ·
'SEMINOLE/PRATTWHT.' (1) ·
'SPARROW DRIVE ' (1) ·
'SR-518 ' (1) ·
'SR-713 (Kings Hwy)' (1) ·
'SR-808 (Glades Rd)' (1) ·
'SR91 N/S TPK 96.55' (1) ·
'SUNSET TRAIL ' (1) ·
'SW GREENRIDGE LANE' (1) ·
'US-192 ' (1) ·
SR-520 (1)
700172 (1) ·
700191 (1) ·
700196 (1) ·
790166 (1) ·
894031 (1) ·
894049 (1) ·
930319 (1) ·
930442 (1) ·
930443 (1) ·
930444 (1) ·
930445 (1) ·
930447 (1) ·
934151 (1) ·
934221 (1) ·
934271 (1) ·
934272 (1) ·
934273 (1) ·
934315 (1) ·
934488 (1) ·
934518 (1) ·
934943 (1) ·
934944 (1) ·
937354 (1) ·
937360 (1) ·
940143 (1)
'.5mi So. of St Lucie Blvd' (1) ·
'0.1MI N OF SANDPIPER AVE.' (1) ·
'0.2 Miles East of US-1 ' (1) ·
'0.2MI E OF SR-7 (US-441) ' (1) ·
'0.3MI W OF RYL PALM BH BL' (1) ·
'0.6MI S of SOUTHERN BLVD ' (1) ·
'0.6MI S of SW96 ST(CR76A)' (1) ·
'0.76 MI SOUTH OF SR 80 ' (1) ·
'0.7MI WEST OF MAPP ROAD ' (1) ·
'0.8 MI N of LANTANA ROAD ' (1) ·
'0.85 mile South of Linton' (1) ·
'1 mile S of Linton Blvd ' (1) ·
'1.3 mile S of Linton Rd. ' (1) ·
'1.3mi. South of Linton ' (1) ·
'1.4 miles east of I-95 ' (1) ·
'4MI N OF OKEECHOBEE BLVD.' (1) ·
'50FT E OF SR-7 (US-441) ' (1) ·
'82FT EAST OF SR-7 ' (1) ·
'9.5 MI S OF CR-880 ' (1) ·
'AT SOUTHERN BLVD. ' (1) ·
'AT SR-7 (Range Line Rd) ' (1) ·
'Saxon Blvd WB - I-4 ' (1) ·
'SR-518 over Eau-Gallie R.' (1) ·
SR-520 - Indian River Relief (1)
26195136 (1) ·
26214420 (1) ·
26251431 (1) ·
26251444 (1) ·
26252840 (1) ·
26290151 (1) ·
26320076 (1) ·
26360954 (1) ·
26401030 (1) ·
26401260 (1) ·
26401280 (1) ·
26401668 (1) ·
26404140 (1) ·
26415887 (1) ·
26421675 (1) ·
26455392 (1) ·
27044705 (1) ·
27100650 (1) ·
27283673 (1) ·
28045218 (1) ·
28074371 (1) ·
28212382 (1) ·
28544052 (1)
80052320 (1) ·
80052546 (1) ·
80052570 (1) ·
80052717 (1) ·
80054930 (1) ·
80084210 (1) ·
80084271 (1) ·
80084275 (1) ·
80084953 (1) ·
80102169 (1) ·
80115706 (1) ·
80120806 (1) ·
80120923 (1) ·
80121591 (1) ·
80131759 (1) ·
80140096 (1) ·
80165077 (1) ·
80182538 (1) ·
80183914 (1) ·
80235569 (1) ·
80293882 (1) ·
80355880 (1) ·
80390094 (1) ·
80423456 (1) ·
81161842 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 25 results in range #1 to #25.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)