Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BESSEY CREEK ' (1) ·
'CANAL ' (1) ·
'CPB20 CANAL ' (1) ·
'E-1 Canal ' (1) ·
'E-3 CANAL ' (1) ·
'El Rio Canal E-4 ' (1) ·
'Halifax River IWW ' (1) ·
'LIPTOG CANAL ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'Reed Canal ' (1) ·
'RELIEF CANAL ' (1) ·
'SR-70 (Okeechobee Rd.) ' (1) ·
'SR-76 & St. Lucie Canal ' (1) ·
'SWEETIE SLOUGH ' (1) ·
'Turkey Creek ' (1)
'GOLDFINCH LANE ' (1) ·
'MURPHY RD ' (1) ·
'NB SR-9 (I-95) ' (1) ·
'PINE RIDGE WAY ' (1) ·
'PIONEER ROAD ' (1) ·
'Port Malabar Bl EB' (1) ·
'Reed Ca Prk Ent Rd' (1) ·
'ROYAL PLM BH BL NB' (1) ·
'ROYAL PLM BH BL SB' (1) ·
'SPARROW DRIVE ' (1) ·
'SR-40 ' (1) ·
'SR-808 (Glades Rd)' (1) ·
'SW GREENRIDGE LANE' (1) ·
'US-441 SR-15 ' (1) ·
'VILLAGE BLVD (NB) ' (1) ·
'VILLAGE BLVD (SB) ' (1) ·
'WB Lake Worth Rd. ' (1)
705910 (1) ·
790132 (1) ·
796500 (1) ·
890103 (1) ·
890112 (1) ·
894049 (1) ·
930319 (1) ·
930328 (1) ·
930401 (1) ·
934221 (1) ·
937354 (1) ·
937360 (1) ·
937361 (1) ·
937363 (1) ·
937710 (1) ·
937711 (1) ·
937714 (1) ·
940102 (1)
'0.1MI N OF SANDPIPER AVE.' (1) ·
'0.3MI W OF RYL PALM BH BL' (1) ·
'0.4MI NW OF HIGH MEADOW ' (1) ·
'0.6MI S of SW96 ST(CR76A)' (1) ·
'1.4 miles east of I-95 ' (1) ·
'1.6 miles East of SR-507 ' (1) ·
'1mi. east of Jog Rd. ' (1) ·
'2MI N OF OKEECHOBEE BLV ' (1) ·
'2Mi S of 45TH ST CR-702 ' (1) ·
'2mi S of SR-68(Orange Av)' (1) ·
'50FT W OF VILLAGE BLVD ' (1) ·
'82FT EAST OF SR-7 ' (1) ·
'Intrsect w Reed Canal Rd ' (1) ·
'SR-40 over IWW ' (1) ·
'SR-808 at SR-7 Boca Raton' (1) ·
'US-441 and SR-76 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 18 results in range #1 to #18.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)