Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Angle Rd - Belcher Canal' (1) ·
'Angle Rd.- Belcher Canal' (1) ·
'C-18 Canal ' (1) ·
'Donald Ross Road ' (1) ·
'I-95 (SR-9) ' (1) ·
'LK OSBORNE DR&CENTER DR ' (1) ·
'M-1 CANAL ' (1) ·
'SR 706 & I-95/SR706 Ramp' (1) ·
'SR 706 To NB I 95 ' (1) ·
'SR-68 ' (1) ·
'SR-706 Indiantown Rd. ' (1) ·
'SR-706 Indiantown Rd. ' (1) ·
'SR-76 ' (1) ·
'SR-91 (Fla's. Turnpike) ' (1) ·
'SR-91 (Fla's.Turnpike) ' (1) ·
'SR-91 Fl. Tpk ' (1) ·
'St. Johns River ' (1) ·
'St. Lucie Canal ' (1)
'6TH AVE SO. WB ' (1) ·
'EB 706 To SB I-95 ' (1) ·
'NB I 95 SR9 ' (1) ·
'NB I 95 SR 9 ' (1) ·
'NB I-95 ( SR-9 ) ' (1) ·
'NB I-95 (S.R. 9) ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'OKEECHOBEE RD. EB ' (1) ·
'SB I 95 SR9 ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SB I 95 SR 9 Ramp ' (1) ·
'SB I-95 ( SR-9 ) ' (1) ·
'SB I-95 (S.R. 9) ' (1) ·
'SB I-95 (SR 9) ' (1) ·
'SB I-95 (SR-9 ) ' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SR-415 ' (1) ·
'WB SR706 to SB 95 ' (1) ·
'WB SR706 to SB I95' (1)
790124 (1) ·
890121 (1) ·
890122 (1) ·
890128 (1) ·
890129 (1) ·
890132 (1) ·
890133 (1) ·
930371 (1) ·
930372 (1) ·
930380 (1) ·
930382 (1) ·
930383 (1) ·
930384 (1) ·
930385 (1) ·
930386 (1) ·
930387 (1) ·
930390 (1) ·
930394 (1) ·
934220 (1) ·
934302 (1) ·
940092 (1) ·
940093 (1) ·
940096 (1) ·
940097 (1)
'0.2Mi W OF ROYAL P.B. BLV' (1) ·
'0.3 mile South of SR 706 ' (1) ·
'0.6MI WEST OF I-95 ' (1) ·
'1.5 Mi N/O SW Kanner Hwy ' (1) ·
'1.5 N of SW KANNER HWY ' (1) ·
'1mi N of SR-76(Kanner Hw)' (1) ·
'2.5 mi. N of SR 70 ' (1) ·
'I 95 SR 706 Interchange ' (1) ·
'I 95 SR706 interchange ' (1) ·
'I-95 / Donald Ross Rd ' (1) ·
'I-95 / SR 706 interchange' (1) ·
'Jupiter Interchange/I-95 ' (1) ·
'Just North of SR70 on I95' (1) ·
'South of Ramp to SR 706 ' (1) ·
'South of St Lucie Canal ' (1) ·
'South of St. Lucie Canal ' (1) ·
'SR 706 to I 95 Ramp ' (1) ·
'SR-415 - St. Johns River ' (1) ·
'Tpk. SR 706 Interchange ' (1)
26363379 (1) ·
26422207 (1) ·
26525862 (1) ·
26525996 (1) ·
26554560 (1) ·
26554700 (1) ·
26554800 (1) ·
26560369 (1) ·
26560443 (1) ·
26560450 (1) ·
26560606 (1) ·
26561100 (1) ·
26561248 (1) ·
27063113 (1) ·
27063191 (1) ·
27070958 (1) ·
27071400 (1) ·
27072925 (1) ·
27073032 (1) ·
27264995 (1) ·
27265210 (1) ·
27281041 (1) ·
27281411 (1) ·
28480959 (1)
80043911 (1) ·
80074066 (1) ·
80074402 (1) ·
80085370 (1) ·
80085515 (1) ·
80085650 (1) ·
80085830 (1) ·
80085950 (1) ·
80090063 (1) ·
80090130 (1) ·
80090683 (1) ·
80091289 (1) ·
80135980 (1) ·
80153644 (1) ·
80153917 (1) ·
80160809 (1) ·
80161732 (1) ·
80164549 (1) ·
80164845 (1) ·
80233690 (1) ·
80233991 (1) ·
80252971 (1) ·
80254109 (1) ·
81123701 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 24 results in range #1 to #24.