Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'ARCHIES CREEK ' (1) ·
'CANAL E-4 ' (1) ·
'Canal No. 1 (Rim Canal) ' (1) ·
'CSX RR ' (1) ·
'E3 CANAL ' (1) ·
'FL. TPK. SR-91 ' (1) ·
'FLORIDA TURNPIKE ' (1) ·
'Hillsboro Canal L14 ' (1) ·
'JONES CREEK ' (1) ·
'KELLER CANAL ' (1) ·
'LWDD C-17 CANAL ' (1) ·
'RELIEF CANAL ' (1) ·
'RETENTION POND ' (1) ·
'ROEBUCK CREEK ' (1) ·
'SIMS CREEK ' (1) ·
'WPB Canal (C-51) ' (1)
'BUCKSKIN TRAIL ' (1) ·
'CENTER DRIVE ' (1) ·
'CENTER STREET ' (1) ·
'DYER PARK ROAD ' (1) ·
'Forest Hill Blvd. ' (1) ·
'LA MANCHA AVE. ' (1) ·
'LAKE IDA ROAD ' (1) ·
'MADRID STREET ' (1) ·
'McClure Road ' (1) ·
'N. LAKE BLVD EB ' (1) ·
'N. LAKE BLVD WB ' (1) ·
'NORTHLAKE BLVD(EB)' (1) ·
'NORTHLAKE BLVD(WB)' (1) ·
'PGA Blvd. (SR 786)' (1) ·
'PROSPERITY FARM RD' (1) ·
'SR 804 ' (1) ·
'SR-15 Main St. ' (1)
894051 (1) ·
930265 (1) ·
930267 (1) ·
930268 (1) ·
930289 (1) ·
930338 (1) ·
930446 (1) ·
934137 (1) ·
934140 (1) ·
934146 (1) ·
934147 (1) ·
934148 (1) ·
934149 (1) ·
934357 (1) ·
934964 (1) ·
934965 (1) ·
936701 (1) ·
937356 (1) ·
937359 (1)
'0.1MI N of BILBAO ST. ' (1) ·
'0.1MI W of HAVERHILL RD. ' (1) ·
'0.3MI E OF CONGRESS ' (1) ·
'0.6MI NE OF INDIANTOWN RD' (1) ·
'0.8MI E OF I-95 ' (1) ·
'0.8MI E of INDIANTOWN RD ' (1) ·
'0.8MI EAST OF I-95 ' (1) ·
'0.9 MILE N OF PGA BLVD. ' (1) ·
'1.1 MI E OF JOG ROAD ' (1) ·
'1.5MI W OF MILITARY TRAIL' (1) ·
'150ft. W of WILDWOOD DR ' (1) ·
'180ft W of LAS PALMAS ST.' (1) ·
'1MI SW OF US-441 ' (1) ·
'At East Canal St. ' (1) ·
'IN JOHN PRINCE PARK ' (1) ·
'Just West of I 95 ' (1) ·
'Just west of I-95 ' (1) ·
'Tpk/PGA Blvd interchange ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)