Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CSX Railroad ' (1) ·
'CSX RR ' (1) ·
'E-1 CANAL ' (1) ·
'E-1-E CANAL ' (1) ·
'Eau-Gallie River ' (1) ·
'F.P.F.W.C.D. Canal No. 1' (1) ·
'FL. TPK. SR-91 ' (1) ·
'Hillsboro Canal L14 ' (1) ·
'I 95 SR 9 ' (1) ·
'I-4 ' (1) ·
'I-95 (SR-9) ' (1) ·
'Intracoastal Waterway ' (1) ·
'L-14 CANAL ' (1) ·
'L-5 CANAL ' (1) ·
'LATERAL CANAL L-5 ' (1) ·
'M CANAL ' (1) ·
'RELIEF CANAL ' (1) ·
'SFWMD C-51 CANAL ' (1) ·
'SHAWANO DRAINAGE DITCH ' (1) ·
'SR-614 (Indrio Rd) ' (1) ·
Indian River Relief East (1)
'BOB W RD 130TH ST.' (1) ·
'BROWNS FARM/CR-827' (1) ·
'JOG ROAD ' (1) ·
'JOG ROAD (NB) ' (1) ·
'JOG ROAD (SB) ' (1) ·
'LA MANCHA AVE. ' (1) ·
'MADRID STREET ' (1) ·
'MARINA BLVD. ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'Peninsula Corp Dr ' (1) ·
'PGA Blvd. (SR 786)' (1) ·
'Saxon Blvd WB ' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SEMINOLE/PRATTWHT.' (1) ·
'SR 804 ' (1) ·
'SR 804 Boyton B B ' (1) ·
'SR A1A ' (1) ·
'SR-15 Main St. ' (1) ·
'SR-518 ' (1) ·
'SR-713 (Kings Hwy)' (1) ·
'SR91 N/S TPK 96.55' (1) ·
SR-520 (1)
700191 (1) ·
700196 (1) ·
790166 (1) ·
930265 (1) ·
930269 (1) ·
930285 (1) ·
930289 (1) ·
930338 (1) ·
930442 (1) ·
930443 (1) ·
930447 (1) ·
934151 (1) ·
934271 (1) ·
934272 (1) ·
934273 (1) ·
934315 (1) ·
934488 (1) ·
934518 (1) ·
934943 (1) ·
934944 (1) ·
937356 (1) ·
937359 (1) ·
940086 (1) ·
940087 (1) ·
940143 (1)
'.5mi So. of St Lucie Blvd' (1) ·
'0.1MI N of BILBAO ST. ' (1) ·
'0.2MI E OF SR-7 (US-441) ' (1) ·
'0.5mi. East of US-1 ' (1) ·
'0.6MI S of SOUTHERN BLVD ' (1) ·
'0.76 MI SOUTH OF SR 80 ' (1) ·
'0.8 MI N of LANTANA ROAD ' (1) ·
'1 mile West of US 1 ' (1) ·
'1.3 mile S of Linton Rd. ' (1) ·
'1.3mi. South of Linton ' (1) ·
'180ft W of LAS PALMAS ST.' (1) ·
'4MI N OF OKEECHOBEE BLVD.' (1) ·
'50FT E OF SR-7 (US-441) ' (1) ·
'9.5 MI S OF CR-880 ' (1) ·
'At East Canal St. ' (1) ·
'AT SOUTHERN BLVD. ' (1) ·
'AT SR-7 (Range Line Rd) ' (1) ·
'Just West of I 95 ' (1) ·
'NB I-95/SR-614(Indrio Rd)' (1) ·
'Saxon Blvd WB - I-4 ' (1) ·
'SB I-95/SR-614(INDRIO RD)' (1) ·
'SR-518 over Eau-Gallie R.' (1) ·
'Tpk/PGA Blvd interchange ' (1) ·
SR-520 - Indian River Relief (1)
26195136 (1) ·
26251431 (1) ·
26251444 (1) ·
26290151 (1) ·
26314400 (1) ·
26314407 (1) ·
26320076 (1) ·
26360954 (1) ·
26401030 (1) ·
26401260 (1) ·
26401280 (1) ·
26404140 (1) ·
26411023 (1) ·
26424333 (1) ·
26433343 (1) ·
26455392 (1) ·
26465867 (1) ·
26502106 (1) ·
27283673 (1) ·
27311700 (1) ·
27311955 (1) ·
28074371 (1) ·
28212382 (1) ·
28544052 (1)
80025351 (1) ·
80042314 (1) ·
80042770 (1) ·
80052546 (1) ·
80052717 (1) ·
80074689 (1) ·
80084210 (1) ·
80084271 (1) ·
80084275 (1) ·
80084953 (1) ·
80102169 (1) ·
80115706 (1) ·
80120923 (1) ·
80121591 (1) ·
80130501 (1) ·
80130890 (1) ·
80182538 (1) ·
80235569 (1) ·
80270180 (1) ·
80270543 (1) ·
80293882 (1) ·
80390094 (1) ·
80400416 (1) ·
80423456 (1) ·
81161842 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 25 results in range #1 to #25.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)