Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'B-19 Canal ' (1) ·
'C-51/WEST PALM BCH CANAL' (1) ·
'Callalisa Creek ' (1) ·
'CSX RR ' (1) ·
'E-4 CANAL ' (1) ·
'FL. TPK. SR-91 ' (1) ·
'I 95 SR 9 ' (1) ·
'Intracoastal Waterway ' (1) ·
'IWW Indian River ' (1) ·
'LATERAL E DRAIN CANAL ' (1) ·
'LWDD C-17 CANAL ' (1) ·
'LWDD CANAL E-1 ' (1) ·
'LWDD E-1 Canal ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'RELIEF CANAL ' (1) ·
'SR-614 (Indrio Rd) ' (1) ·
'SR-91 TPK-DRAINAGE CANAL' (1) ·
'SR-91 TPK/DRAINAGE CANAL' (1) ·
'Thompson River ' (1)
'10TH AVE NORTH ' (1) ·
'27TH STREET ' (1) ·
'BINKS FOREST DRIVE' (1) ·
'CLINT MOORE RD ' (1) ·
'HYPOLUXO ROAD WB ' (1) ·
'LA MANCHA AVE. ' (1) ·
'Lake Worth Road ' (1) ·
'MADRID STREET ' (1) ·
'Military Trail ' (1) ·
'MINER RD. ' (1) ·
'N. LAKE BLVD EB ' (1) ·
'N. LAKE BLVD WB ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'PGA Blvd. (SR 786)' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SR 804 ' (1) ·
'SR 804 Boyton B B ' (1) ·
'SR A1A ' (1) ·
'SR-44 ' (1) ·
'SW 18TH ST WB ' (1) ·
'SW 18TH ST. EB ' (1) ·
'Willow Run Blvd. ' (1)
790151 (1) ·
790152 (1) ·
796401 (1) ·
885809 (1) ·
930265 (1) ·
930267 (1) ·
930268 (1) ·
930269 (1) ·
930285 (1) ·
930289 (1) ·
930413 (1) ·
934138 (1) ·
934293 (1) ·
934345 (1) ·
934348 (1) ·
934925 (1) ·
934926 (1) ·
934929 (1) ·
934942 (1) ·
937356 (1) ·
937359 (1) ·
940086 (1) ·
940087 (1)
'.2mi W of Clyde Morris Bl' (1) ·
'0.1MI N of BILBAO ST. ' (1) ·
'0.2 MILE WEST OF US-1 ' (1) ·
'0.3MI E of CONGRESS AVE. ' (1) ·
'0.5mi. East of US-1 ' (1) ·
'0.7 mi south of PGA Blvd.' (1) ·
'0.8MI E OF I-95 ' (1) ·
'0.8MI EAST OF I-95 ' (1) ·
'0.9MI W OF MILITARY TRAIL' (1) ·
'0.9MI W OF POWERLINE RD ' (1) ·
'1 mile West of US 1 ' (1) ·
'1.0MI W OF MILITARY TRAIL' (1) ·
'180ft W of LAS PALMAS ST.' (1) ·
'AT US-441 (SOUTHERN BLVD)' (1) ·
'AT US-441 SR-7 ' (1) ·
'Just West of I 95 ' (1) ·
'Lake Worth Rd. at SR-7 ' (1) ·
'NB I-95/SR-614(Indrio Rd)' (1) ·
'SB I-95/SR-614(INDRIO RD)' (1) ·
'SR-44 - Callalisa Creek ' (1) ·
'SR-44 - Indian River ' (1) ·
'Tpk/PGA Blvd interchange ' (1)
26195316 (1) ·
26195370 (1) ·
26243117 (1) ·
26314400 (1) ·
26314407 (1) ·
26332602 (1) ·
26342072 (1) ·
26370131 (1) ·
26375277 (1) ·
26405713 (1) ·
26424333 (1) ·
26433343 (1) ·
26465867 (1) ·
26482992 (1) ·
26483050 (1) ·
26494457 (1) ·
26502106 (1) ·
27311700 (1) ·
27311955 (1) ·
27384786 (1) ·
29012564 (1) ·
29014444 (1) ·
29073249 (1)
80025351 (1) ·
80042314 (1) ·
80042770 (1) ·
80050618 (1) ·
80050893 (1) ·
80050894 (1) ·
80061936 (1) ·
80074621 (1) ·
80074641 (1) ·
80074689 (1) ·
80101305 (1) ·
80101307 (1) ·
80121251 (1) ·
80121646 (1) ·
80130501 (1) ·
80130890 (1) ·
80172828 (1) ·
80240703 (1) ·
80270180 (1) ·
80270543 (1) ·
80541414 (1) ·
80550332 (1) ·
81014619 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 23 results in range #1 to #23.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)