Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CSX RR ' (1) ·
'Deep Ck. Diversion Cnl ' (1) ·
'DRAINAGE CANAL ' (1) ·
'FL. TPK. SR-91 ' (1) ·
'Hillsboro Canal L14 ' (1) ·
'I 95 SR 9 ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'KRUEGER CREEK ' (1) ·
'Lake Ashby Canal ' (1) ·
'LWDD C-17 CANAL ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'RELIEF CANAL ' (1) ·
'SR-614 (Indrio Rd) ' (1) ·
'W.P.B. Canal (C-51) ' (1)
'CR-880 ' (1) ·
'CR-A1A(OCEAN BLVD)' (1) ·
'CR708 SE BRIDGE RD' (1) ·
'LA MANCHA AVE. ' (1) ·
'MADRID STREET ' (1) ·
'Maytown Road ' (1) ·
'N. LAKE BLVD EB ' (1) ·
'N. LAKE BLVD WB ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'PGA Blvd. (SR 786)' (1) ·
'PIPER'S GLEN ROAD ' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SPANISH ISLES BLVD' (1) ·
'SR 804 ' (1) ·
'SR 804 Boyton B B ' (1) ·
'SR A1A ' (1) ·
'SR-15 Main St. ' (1) ·
'SR-805 (Dixie Hwy)' (1)
794139 (1) ·
794141 (1) ·
890107 (1) ·
890120 (1) ·
930265 (1) ·
930267 (1) ·
930268 (1) ·
930269 (1) ·
930285 (1) ·
930289 (1) ·
930338 (1) ·
930351 (1) ·
930373 (1) ·
934905 (1) ·
934940 (1) ·
937356 (1) ·
937359 (1) ·
940086 (1) ·
940087 (1)
'.75 miles South of SR-882' (1) ·
'0.1MI N of BILBAO ST. ' (1) ·
'0.2MI E OF US-441 (SR-7) ' (1) ·
'0.5 MI WEST OF SR-809 ' (1) ·
'0.5mi. East of US-1 ' (1) ·
'0.8MI E OF I-95 ' (1) ·
'0.8MI EAST OF I-95 ' (1) ·
'0.9 M E OF US-1 ON CR-708' (1) ·
'1 mile West of US 1 ' (1) ·
'180ft W of LAS PALMAS ST.' (1) ·
'2MI E of SR-76 ' (1) ·
'3.5 miles East of SR-415 ' (1) ·
'4.1Mi W OF SR-80 ' (1) ·
'4.8 miles East of SR-415 ' (1) ·
'At East Canal St. ' (1) ·
'Just West of I 95 ' (1) ·
'NB I-95/SR-614(Indrio Rd)' (1) ·
'SB I-95/SR-614(INDRIO RD)' (1) ·
'Tpk/PGA Blvd interchange ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)