Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'LA MANCHA AVE. ' (1) ·
'MADRID STREET ' (1) ·
'MURPHY RD ' (1) ·
'N. LAKE BLVD EB ' (1) ·
'N. LAKE BLVD WB ' (1) ·
'PGA Blvd. (SR 786)' (1) ·
'PINE RIDGE WAY ' (1) ·
'ROYAL PLM BH BL NB' (1) ·
'ROYAL PLM BH BL SB' (1) ·
'SR 804 Boyton B B ' (1) ·
'SR A1A ' (1) ·
'SR-15 Main St. ' (1) ·
'SR-808 (Glades Rd)' (1) ·
'US-441 SR-15 ' (1) ·
'VILLAGE BLVD (NB) ' (1) ·
'VILLAGE BLVD (SB) ' (1) ·
'WB SR - 714 ' (1)
890103 (1) ·
890112 (1) ·
890135 (1) ·
930265 (1) ·
930267 (1) ·
930268 (1) ·
930269 (1) ·
930285 (1) ·
930338 (1) ·
930401 (1) ·
937356 (1) ·
937359 (1) ·
937361 (1) ·
937363 (1) ·
937710 (1) ·
937711 (1) ·
937714 (1)
'0.1MI N of BILBAO ST. ' (1) ·
'0.4MI NW OF HIGH MEADOW ' (1) ·
'0.5mi. East of US-1 ' (1) ·
'0.8MI E OF I-95 ' (1) ·
'0.8MI EAST OF I-95 ' (1) ·
'1 mile West of US 1 ' (1) ·
'180ft W of LAS PALMAS ST.' (1) ·
'2.5 mi East of TPK Exit ' (1) ·
'2MI N OF OKEECHOBEE BLV ' (1) ·
'2Mi S of 45TH ST CR-702 ' (1) ·
'50FT W OF VILLAGE BLVD ' (1) ·
'At East Canal St. ' (1) ·
'SR-808 at SR-7 Boca Raton' (1) ·
'Tpk/PGA Blvd interchange ' (1) ·
'US-441 and SR-76 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)