Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BOYNTON CANAL C-16 ' (1) ·
'CANAL C-24 ' (1) ·
'CR 709 & FECRR ' (1) ·
'FL. TPK. SR-91 ' (1) ·
'Galiano Rd & C-24 Canal ' (1) ·
'Galiano Rd. & C-24 Canal' (1) ·
'Hillsboro Canal L14 ' (1) ·
'I 95 SR 9 ' (1) ·
'Intracoastal Waterway ' (1) ·
'LWDD C-17 CANAL ' (1) ·
'MAPLE CREEK ' (1) ·
'RELIEF CANAL ' (1) ·
'SFC CANAL NO 1 ' (1) ·
'SR-507 ' (1) ·
'Ten Mile Creek ' (1)
'CONGRESS AVE ' (1) ·
'LA MANCHA AVE. ' (1) ·
'MADRID STREET ' (1) ·
'MAPP RD ' (1) ·
'N. LAKE BLVD EB ' (1) ·
'N. LAKE BLVD WB ' (1) ·
'NB I-95 (SR 9) ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'PGA Blvd. (SR 786)' (1) ·
'SB I-95 (SR 9) ' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SOUTH BEND BLVD. ' (1) ·
'SR 804 Boyton B B ' (1) ·
'SR A1A ' (1) ·
'SR-15 Main St. ' (1) ·
'SR-507 ' (1) ·
'W LAKE RD CR-717 ' (1)
700186 (1) ·
894033 (1) ·
930265 (1) ·
930267 (1) ·
930268 (1) ·
930269 (1) ·
930285 (1) ·
930338 (1) ·
934491 (1) ·
934505 (1) ·
937356 (1) ·
937359 (1) ·
940113 (1) ·
940114 (1) ·
940115 (1) ·
940116 (1) ·
940123 (1) ·
945251 (1)
'.5 miles South of SR-70 ' (1) ·
'.75 Mile South Midway Rd.' (1) ·
'0.1MI N of BILBAO ST. ' (1) ·
'0.2MI S OF FLORESTA DR ' (1) ·
'0.5mi. East of US-1 ' (1) ·
'0.8MI E OF I-95 ' (1) ·
'0.8MI EAST OF I-95 ' (1) ·
'0.8Mi NORTH OF CR-804 ' (1) ·
'1 mile West of US 1 ' (1) ·
'1.8MI W OF SR-15 ' (1) ·
'1.9MI S of CR-714 ' (1) ·
'180ft W of LAS PALMAS ST.' (1) ·
'2 mi. N of Gatlin Blvd. ' (1) ·
'At East Canal St. ' (1) ·
'SR-507 over Crane Creek ' (1) ·
'Tpk/PGA Blvd interchange ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 18 results in range #1 to #18.