Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BRANCH OF ICWW ' (1) ·
'CR 712 (Midway Road) ' (1) ·
'CR-712 Midway Road ' (1) ·
'CSX RR ' (1) ·
'EL RIO CANAL ' (1) ·
'EPB CANAL C-3 ' (1) ·
'FL. TPK. SR-91 ' (1) ·
'I 95 SR 9 ' (1) ·
'Intracoastal Waterway ' (1) ·
'LWDD C-17 CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'NORTH FORK ST LUCIE RVR ' (1) ·
'RELIEF CANAL ' (1) ·
'SR-614 (Indrio Rd) ' (1)
'CR-712 (MIDWAY RD)' (1) ·
'JUPITER BEACH RD ' (1) ·
'LA MANCHA AVE. ' (1) ·
'LE CHALET BLVD ' (1) ·
'MADRID STREET ' (1) ·
'N. LAKE BLVD EB ' (1) ·
'N. LAKE BLVD WB ' (1) ·
'NB I-95 (S.R. 9) ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'PGA Blvd. (SR 786)' (1) ·
'PROSPERITY FARMSRD' (1) ·
'SB I-95 (S.R. 9) ' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SR 804 ' (1) ·
'SR 804 Boyton B B ' (1) ·
'SR A1A ' (1) ·
'SW 18TH ST ' (1)
930265 (1) ·
930267 (1) ·
930268 (1) ·
930269 (1) ·
930285 (1) ·
930289 (1) ·
934125 (1) ·
934135 (1) ·
934487 (1) ·
935218 (1) ·
937356 (1) ·
937359 (1) ·
940035 (1) ·
940086 (1) ·
940087 (1) ·
940111 (1) ·
940112 (1)
'0.1MI N of BILBAO ST. ' (1) ·
'0.2MI E OF A1A ' (1) ·
'0.2MI S OF DONALD ROSS ' (1) ·
'0.3MI W OF OLD DIXIE HWY.' (1) ·
'0.5mi. East of US-1 ' (1) ·
'0.8MI E OF I-95 ' (1) ·
'0.8MI EAST OF I-95 ' (1) ·
'0.8Mi W OF MILITARY TRAIL' (1) ·
'1 mile West of US 1 ' (1) ·
'180ft W of LAS PALMAS ST.' (1) ·
'1MI W of US-1 ' (1) ·
'I-95 over Midway Road ' (1) ·
'Just West of I 95 ' (1) ·
'NB I-95/SR-614(Indrio Rd)' (1) ·
'SB I-95/SR-614(INDRIO RD)' (1) ·
'Tpk/PGA Blvd interchange ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)