Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
930265 (1) ·
930267 (1) ·
930268 (1) ·
930269 (1) ·
930285 (1) ·
930289 (1) ·
930329 (1) ·
930338 (1) ·
934516 (1) ·
934902 (1) ·
937356 (1) ·
937359 (1)
'0.1MI N of BILBAO ST. ' (1) ·
'0.5mi. East of US-1 ' (1) ·
'0.8MI E OF I-95 ' (1) ·
'0.8MI EAST OF I-95 ' (1) ·
'1 Mile East of Jog Rd. ' (1) ·
'1 mile West of US 1 ' (1) ·
'180ft W of LAS PALMAS ST.' (1) ·
'2.2MI S OF SR-80 ' (1) ·
'ADJ W SIDE MILITARY TRAIL' (1) ·
'At East Canal St. ' (1) ·
'Just West of I 95 ' (1) ·
'Tpk/PGA Blvd interchange ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 12 results in range #1 to #12.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)