Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BELVEDERE ROAD ' (1) ·
'Blue Heron Blvd. ' (1) ·
'BUCKSKIN TRAIL ' (1) ·
'CENTER DRIVE ' (1) ·
'COUNTY RD 507 ' (1) ·
'DYER PARK ROAD ' (1) ·
'I 95 SR 9 SB ' (1) ·
'LA MANCHA AVE. ' (1) ·
'LAKE IDA ROAD ' (1) ·
'NB I 95 SR 9 ' (1) ·
'NORTHLAKE BLVD(EB)' (1) ·
'NORTHLAKE BLVD(WB)' (1) ·
'SR-811 (Alt A-1-A)' (1) ·
'SR91 SB TPK 143.3 ' (1)
880076 (1) ·
894051 (1) ·
930291 (1) ·
930292 (1) ·
930339 (1) ·
930523 (1) ·
934140 (1) ·
934148 (1) ·
934149 (1) ·
934282 (1) ·
934357 (1) ·
934964 (1) ·
937358 (1) ·
940121 (1)
'0.1MI W of HAVERHILL RD. ' (1) ·
'0.2 MI N OF ST LUCIE BLVD' (1) ·
'0.5 MILE WEST OF JOG RD ' (1) ·
'0.6mi East of Congress Av' (1) ·
'1.1 MI E OF JOG ROAD ' (1) ·
'1.5MI W OF MILITARY TRAIL' (1) ·
'150ft. W of WILDWOOD DR ' (1) ·
'175FT S of LAS PALMAS ST ' (1) ·
'4.2MI N OF CR-512 ' (1) ·
'Between SR 80 and SR 882 ' (1) ·
'Between SR 882 and SR 80 ' (1) ·
'City of Jupiter ' (1) ·
'IN JOHN PRINCE PARK ' (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)