Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
890141 (1) ·
890142 (1) ·
930259 (1) ·
930261 (1) ·
930262 (1) ·
930275 (1) ·
930301 (1) ·
930303 (1) ·
930304 (1) ·
930417 (1) ·
934327 (1)
'1.5mi East of Indiantown' (1) ·
'2 mi. N of Lantana Rd ' (1) ·
'2 mi. North of Lantana Rd' (1) ·
'3 MI. east of SR-710 ' (1) ·
'I 95 Exit 56 ' (1) ·
'Just E SR 7-Forest Hill ' (1) ·
'Just West of I 95 ' (1) ·
'Lake Worth ' (1) ·
'Lantana I 95 Interchange ' (1) ·
'Over I 95 1 mi S of SR804' (1) ·
'SR-704 Over SR-91 ' (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 11 results in range #1 to #11.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)