Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Airport Road ' (1) ·
'BELVEDERE RD EB ' (1) ·
'BELVEDERE RD WB ' (1) ·
'BIG BLUE TRACE ' (1) ·
'COUNTY RD 507 ' (1) ·
'EL CLAIR RANCH RD.' (1) ·
'Entrnce Rd to FDOT' (1) ·
'HORSESHOE POINT RD' (1) ·
'KIMBERLY BLVD. EB ' (1) ·
'Marsh Road ' (1) ·
'MIAMI CANAL ROAD ' (1) ·
'PALMETTO PK RD ' (1) ·
'Richland Ave ' (1) ·
'SW 18th STREET EB ' (1) ·
'SW 18TH STREET WB ' (1) ·
'SW 23RD AVE. ' (1) ·
'Willowood Drive ' (1)
704013 (1) ·
704019 (1) ·
704032 (1) ·
794036 (1) ·
794067 (1) ·
880076 (1) ·
890101 (1) ·
930302 (1) ·
934205 (1) ·
934206 (1) ·
934212 (1) ·
934419 (1) ·
934428 (1) ·
934516 (1) ·
934900 (1) ·
934901 (1) ·
934902 (1)
'.21 E of Minton Rd. ' (1) ·
'0.1Mi E of Tymber Crk Rd.' (1) ·
'0.2 Mi E of ANCHOR AVE. ' (1) ·
'0.25 MI. W OF I-95 ' (1) ·
'0.2MI E OF US-441 (SR-7) ' (1) ·
'0.4 mile East of SR-3 ' (1) ·
'1.1 miles North of US-92 ' (1) ·
'1.2Mi N OF LAKE IDA RD. ' (1) ·
'1MI W OF SR 809 ' (1) ·
'2.2MI S OF SR-80 ' (1) ·
'4.2MI N OF CR-512 ' (1) ·
'50ft. East of Fiske Blvd ' (1) ·
'ADJ W SIDE MILITARY TRAIL' (1) ·
'AT SOUTHSIDE OF SR-80 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)