Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Danforth Creek ' (1) ·
'E-3 CANAL ' (1) ·
'Hypoluxo Rd. ' (1) ·
'Hypoluxo Road ' (1) ·
'Indian River IWW ' (1) ·
'Lantana Road ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'PGA Blvd SR 786 ' (1) ·
'SR 786 PGA Blvd ' (1) ·
'SR 802 Lake Worth Rd ' (1) ·
'SR-70 (Okeechobee Rd.) ' (1) ·
'SR802 Lake Worth Rd ' (1) ·
'Summit Boulevard ' (1) ·
'Turkey Creek ' (1)
'BELVEDERE RD EB ' (1) ·
'BELVEDERE RD WB ' (1) ·
'EB SR - 714 ' (1) ·
'Hypoluxo to SB I95' (1) ·
'I 95 NB SR 9 ' (1) ·
'I 95 SR 9 NB ' (1) ·
'I 95 SR 9 SB ' (1) ·
'KIMBERLY BLVD. EB ' (1) ·
'Lantana to I 95 SB' (1) ·
'NB I 95 SR 9 ' (1) ·
'NB SR-9 (I-95) ' (1) ·
'Port Malabar Bl EB' (1) ·
'SB I 95 SR 9 ' (1) ·
'SB I 95 to Lantana' (1) ·
'SB SR-9 ( I-95) ' (1) ·
'SBI-95 to Hypoluxo' (1) ·
'SW 18th STREET EB ' (1) ·
'SW 18TH STREET WB ' (1) ·
'US-192 WB ' (1) ·
'WB Lake Worth Rd. ' (1)
700174 (1) ·
705910 (1) ·
890134 (1) ·
930261 (1) ·
930262 (1) ·
930274 (1) ·
930275 (1) ·
930291 (1) ·
930292 (1) ·
930298 (1) ·
930299 (1) ·
930328 (1) ·
930335 (1) ·
930336 (1) ·
934205 (1) ·
934206 (1) ·
934428 (1) ·
934900 (1) ·
934901 (1) ·
940101 (1) ·
940102 (1)
'0.2MI E OF US-441 (SR-7) ' (1) ·
'1.6 miles East of SR-507 ' (1) ·
'1MI W OF SR 809 ' (1) ·
'1mi. east of Jog Rd. ' (1) ·
'1mi. N of North Lake Blvd' (1) ·
'1mi. N of Northlake Blvd.' (1) ·
'2 mi. N of Lantana Rd ' (1) ·
'2 mi. North of Lantana Rd' (1) ·
'2.5 mi East of TPK Exit ' (1) ·
'2mi S of SR-68(Orange Av)' (1) ·
'ADJ W SIDE MILITARY TRAIL' (1) ·
'Between SR 80 and SR 882 ' (1) ·
'Between SR 882 and SR 80 ' (1) ·
'Hypoluxo Rd I 95 Interch ' (1) ·
'Hypoluxo Rd.-I95 intercha' (1) ·
'Lantana I 95 Interchange ' (1) ·
'US-192 WB-Indian River ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
10583 (1) ·
148776 (1) ·
15000 (1) ·
199525 (1) ·
201260 (1) ·
20820 (1) ·
22555 (1) ·
24290 (1) ·
30796 (1) ·
32098 (1) ·
37303 (1) ·
38170 (1) ·
39038 (1) ·
50848 (1) ·
6812 (1)
Showing below up to 21 results in range #1 to #21.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)