Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-23 CANAL ' (1) ·
'C-51 Canal ' (1) ·
'Crane Creek ' (1) ·
'EAST TURTLE CREEK ' (1) ·
'El Rio Canal ' (1) ·
'FPL Nuc Plant Disc Canal' (1) ·
'FPL Nuc Plant Intake Cnl' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 (SR-9)/CSXRR ' (1) ·
'LWDD E 3-1/2 CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD LAT 17 CANAL ' (1) ·
'Military Trail & CSX RR ' (1) ·
'Palm Beach Canal C-51 ' (1) ·
'RELIEF CANAL ' (1) ·
'Spruce Creek ' (1) ·
'Ten Mile Creek ' (1) ·
'Turnbull Creek ' (1) ·
'WPB STUB CANAL ' (1)
'BELVEDERE RD ' (1) ·
'CONGRESS AVE SB ' (1) ·
'COUNTY LINE RD ' (1) ·
'EB SR808 Glades Rd' (1) ·
'GRANDVIEW WAY ' (1) ·
'Hypoluxo Rd ' (1) ·
'I 95 SR 9 ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'NW 13 ST ' (1) ·
'Park Road ' (1) ·
'Pioneer Trail ' (1) ·
'Pioneer Trail ' (1) ·
'ROYAL PLM BH BL SB' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SR A1A ' (1) ·
'SR-5/S. Olive Ave.' (1) ·
'US-192 ' (1) ·
'WALLIS ROAD ' (1) ·
'WB SR-70 ' (1) ·
'WB SR808 Glades Rd' (1)
700033 (1) ·
794117 (1) ·
794118 (1) ·
890110 (1) ·
890111 (1) ·
894021 (1) ·
930245 (1) ·
930246 (1) ·
930247 (1) ·
930248 (1) ·
930251 (1) ·
930307 (1) ·
930367 (1) ·
930801 (1) ·
934208 (1) ·
934223 (1) ·
934331 (1) ·
935215 (1) ·
937362 (1) ·
937366 (1) ·
940084 (1) ·
940085 (1) ·
940120 (1)
'.5 Mi W of SR-507 ' (1) ·
'.5mi East US1 Lakeworth ' (1) ·
'0.03Mi E of NW 15TH AVE ' (1) ·
'0.15 mi East of Bay Drive' (1) ·
'0.1MI N OF BELVEDERE ROAD' (1) ·
'0.1MI W OF I-95 ' (1) ·
'0.25 miles S/O SR 794 ' (1) ·
'0.3M N OF OKEECHOBEE BLV ' (1) ·
'0.5 MI W OF HAVERHILL RD ' (1) ·
'0.6Mi S OF CR-812 ' (1) ·
'1.3 miles East of CR-415 ' (1) ·
'2.5Mi W of US-1 ' (1) ·
'2.6MI W OF SEMINOLE PRATT' (1) ·
'2mi. N of SR714 on I95 ' (1) ·
'2mi.N of SR714 on I95 ' (1) ·
'3.9 mi. W of FL Turnpike ' (1) ·
'800 ft West of I 95 ' (1) ·
'Hypoluxo Rd over I 95&RR ' (1) ·
'SR 808 / I 95 Interchange' (1) ·
'SR 808 I 95 Interchange ' (1) ·
'SR A1A FPL Nuc P Intake ' (1) ·
'SR AIA FPL Nuc Plt Disc ' (1)
26214151 (1) ·
26220525 (1) ·
26220535 (1) ·
26220610 (1) ·
26220625 (1) ·
26232830 (1) ·
26342000 (1) ·
26344631 (1) ·
26383900 (1) ·
26405332 (1) ·
26410344 (1) ·
26412668 (1) ·
26414262 (1) ·
26423785 (1) ·
26590684 (1) ·
27121953 (1) ·
27122261 (1) ·
27204020 (1) ·
27205945 (1) ·
27233900 (1) ·
28044331 (1) ·
29013457 (1) ·
29030188 (1)
80030866 (1) ·
80041000 (1) ·
80041580 (1) ·
80052320 (1) ·
80055235 (1) ·
80065384 (1) ·
80065459 (1) ·
80070620 (1) ·
80070650 (1) ·
80071550 (1) ·
80071555 (1) ·
80074249 (1) ·
80123486 (1) ·
80134460 (1) ·
80142440 (1) ·
80143606 (1) ·
80210453 (1) ·
80240091 (1) ·
80240291 (1) ·
80273077 (1) ·
80374655 (1) ·
80572813 (1) ·
81024737 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 23 results in range #1 to #23.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)