Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BRANCH OF ICWW ' (1) ·
'CR 712 (Midway Road) ' (1) ·
'CR-712 Midway Road ' (1) ·
'EAST TURTLE CREEK ' (1) ·
'EL RIO CANAL ' (1) ·
'EPB CANAL C-3 ' (1) ·
'FPL Nuc Plant Disc Canal' (1) ·
'FPL Nuc Plant Intake Cnl' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 (SR-9)/CSXRR ' (1) ·
'ICWW ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'LWDD E 3-1/2 CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'Military Trail & CSX RR ' (1) ·
'NORTH FORK ST LUCIE RVR ' (1) ·
'WPB STUB CANAL ' (1)
'BELVEDERE RD ' (1) ·
'COUNTY LINE RD ' (1) ·
'CR-712 (MIDWAY RD)' (1) ·
'EB SR808 Glades Rd' (1) ·
'Hypoluxo Rd ' (1) ·
'I 95 SR 9 ' (1) ·
'JUPITER BEACH RD ' (1) ·
'LE CHALET BLVD ' (1) ·
'LINTON BLVD. ' (1) ·
'NB I-95 (S.R. 9) ' (1) ·
'NW 13 ST ' (1) ·
'PROSPERITY FARMSRD' (1) ·
'SB I-95 (S.R. 9) ' (1) ·
'SR A1A ' (1) ·
'SR AIA ' (1) ·
'SW 18TH ST ' (1) ·
'WB SR808 Glades Rd' (1)
894021 (1) ·
930245 (1) ·
930246 (1) ·
930247 (1) ·
930248 (1) ·
930251 (1) ·
930307 (1) ·
930322 (1) ·
934125 (1) ·
934135 (1) ·
934208 (1) ·
934487 (1) ·
935215 (1) ·
935218 (1) ·
940035 (1) ·
940084 (1) ·
940085 (1) ·
940094 (1) ·
940111 (1) ·
940112 (1)
'0.03Mi E of NW 15TH AVE ' (1) ·
'0.1MI W OF I-95 ' (1) ·
'0.25 miles S/O SR 794 ' (1) ·
'0.2MI E OF A1A ' (1) ·
'0.2MI EAST OF US-1 (SR-5)' (1) ·
'0.2MI S OF DONALD ROSS ' (1) ·
'0.3MI W OF OLD DIXIE HWY.' (1) ·
'0.8Mi W OF MILITARY TRAIL' (1) ·
'1MI W of US-1 ' (1) ·
'2.5Mi W of US-1 ' (1) ·
'800 ft West of I 95 ' (1) ·
'Hypoluxo Rd over I 95&RR ' (1) ·
'I-95 over Midway Road ' (1) ·
'South Causeway over ICWW ' (1) ·
'SR 808 / I 95 Interchange' (1) ·
'SR 808 I 95 Interchange ' (1) ·
'SR A1A FPL Nuc P Intake ' (1) ·
'SR AIA FPL Nuc Plt Disc ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 20 results in range #1 to #20.