Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CPB20 CANAL ' (1) ·
'E-3 CANAL ' (1) ·
'El Rio Canal ' (1) ·
'FPL Nuc Plant Disc Canal' (1) ·
'FPL Nuc Plant Intake Cnl' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 (SR-9)/CSXRR ' (1) ·
'LWDD E 3-1/2 CANAL ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'Military Trail & CSX RR ' (1) ·
'RELIEF CANAL ' (1) ·
'SR-70 (Okeechobee Rd.) ' (1) ·
'SWEETIE SLOUGH ' (1) ·
'Turkey Creek ' (1) ·
'WPB STUB CANAL ' (1)
'BELVEDERE RD ' (1) ·
'EB SR808 Glades Rd' (1) ·
'GOLDFINCH LANE ' (1) ·
'Hypoluxo Rd ' (1) ·
'I 95 SR 9 ' (1) ·
'NB SR-9 (I-95) ' (1) ·
'NW 13 ST ' (1) ·
'PIONEER ROAD ' (1) ·
'Port Malabar Bl EB' (1) ·
'SB SR-9 ( I-95) ' (1) ·
'SPARROW DRIVE ' (1) ·
'SR A1A ' (1) ·
'SW GREENRIDGE LANE' (1) ·
'WB Lake Worth Rd. ' (1) ·
'WB SR808 Glades Rd' (1)
705910 (1) ·
894049 (1) ·
930245 (1) ·
930246 (1) ·
930247 (1) ·
930251 (1) ·
930307 (1) ·
930328 (1) ·
934208 (1) ·
934221 (1) ·
935215 (1) ·
937354 (1) ·
937360 (1) ·
940084 (1) ·
940085 (1) ·
940101 (1) ·
940102 (1)
'0.03Mi E of NW 15TH AVE ' (1) ·
'0.1MI N OF SANDPIPER AVE.' (1) ·
'0.1MI W OF I-95 ' (1) ·
'0.25 miles S/O SR 794 ' (1) ·
'0.3MI W OF RYL PALM BH BL' (1) ·
'0.6MI S of SW96 ST(CR76A)' (1) ·
'1.6 miles East of SR-507 ' (1) ·
'1mi. east of Jog Rd. ' (1) ·
'2mi S of SR-68(Orange Av)' (1) ·
'800 ft West of I 95 ' (1) ·
'82FT EAST OF SR-7 ' (1) ·
'Hypoluxo Rd over I 95&RR ' (1) ·
'SR 808 / I 95 Interchange' (1) ·
'SR A1A FPL Nuc P Intake ' (1) ·
'SR AIA FPL Nuc Plt Disc ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 17 results in range #1 to #17.