Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-51/WEST PALM BCH CANAL' (1) ·
'Callalisa Creek ' (1) ·
'Intracoastal Waterway ' (1) ·
'Intracoastal Waterway ' (1) ·
'LATERAL E DRAIN CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD LATERAL 14 CANAL ' (1) ·
'OKEECHOBEE BLVD ' (1) ·
'SR 794 Yamato Rd ' (1) ·
'St Johns River ' (1) ·
'Thompson River ' (1) ·
'Tide Relief Canal ' (1) ·
'West Palm Beach Canal ' (1)
'10TH AVE NORTH ' (1) ·
'27TH STREET ' (1) ·
'AUSTRALIAN AVE NB ' (1) ·
'AUSTRALIAN AVE SB ' (1) ·
'BINKS FOREST DRIVE' (1) ·
'EB SR 802 Lake Ave' (1) ·
'I 95 NB ' (1) ·
'I 95 SB ' (1) ·
'Military Trail ' (1) ·
'NB US-441 (SR-7) ' (1) ·
'SR-44 ' (1) ·
'SR-528 ' (1) ·
'SR-A1A ' (1) ·
'WB SR 802 Lake Ave' (1)
700084 (1) ·
700150 (1) ·
790151 (1) ·
885809 (1) ·
930104 (1) ·
930189 (1) ·
930201 (1) ·
930318 (1) ·
930361 (1) ·
930409 (1) ·
934138 (1) ·
934275 (1) ·
934276 (1) ·
934293 (1) ·
934318 (1) ·
934348 (1)
'0.2 MILE WEST OF US-1 ' (1) ·
'0.5MI EAST OF I-95 ' (1) ·
'0.7 mi south of PGA Blvd.' (1) ·
'0.9MI S OF SR-802 ' (1) ·
'0.9MI W OF MILITARY TRAIL' (1) ·
'A1A on Singer Island ' (1) ·
'AT US-441 (SOUTHERN BLVD)' (1) ·
'Just North of Exit 48 ' (1) ·
'Just South of Exit 48 ' (1) ·
'Lake Ave / ICWW ' (1) ·
'Lake Ave. / ICWW ' (1) ·
'SR-44 - Callalisa Creek ' (1) ·
'SR-528 EB-St Johns River ' (1) ·
'SR-528 WB-St Johns River ' (1) ·
'SR-7 & SR-80 intersection' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 16 results in range #1 to #16.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)