Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-51 Canal ' (1) ·
'I 95 SR 9 ' (1) ·
'Intracoastal Waterway ' (1) ·
'Intracoastal Waterway ' (1) ·
'LWDD CANAL E-1 ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD LAT 17 CANAL ' (1) ·
'OKEECHOBEE BLVD ' (1) ·
'Palm Beach Canal C-51 ' (1) ·
'RELIEF CANAL ' (1) ·
'SR 794 Yamato Rd ' (1)
'AUSTRALIAN AVE NB ' (1) ·
'AUSTRALIAN AVE SB ' (1) ·
'CENTRAL PK BL S EB' (1) ·
'CENTRL PK BL S WB' (1) ·
'Clint Moore Road ' (1) ·
'CONGRESS AVE SB ' (1) ·
'EB SR 802 Lake Ave' (1) ·
'GRANDVIEW WAY ' (1) ·
'I 95 NB ' (1) ·
'I 95 SB ' (1) ·
'KIMBERLY BLVD. WB ' (1) ·
'Park Road ' (1) ·
'ROYAL PLM BH BL SB' (1) ·
'SR-5/S. Olive Ave.' (1) ·
'WALLIS ROAD ' (1) ·
'WB SR 802 Lake Ave' (1)
930104 (1) ·
930189 (1) ·
930201 (1) ·
930202 (1) ·
930318 (1) ·
930367 (1) ·
930801 (1) ·
934223 (1) ·
934275 (1) ·
934276 (1) ·
934331 (1) ·
934441 (1) ·
934920 (1) ·
934921 (1) ·
937362 (1) ·
937366 (1)
'.5mi East US1 Lakeworth ' (1) ·
'0.1MI N OF BELVEDERE ROAD' (1) ·
'0.2MI E OF US-441 (SR-7) ' (1) ·
'0.3M N OF OKEECHOBEE BLV ' (1) ·
'0.5 MI W OF HAVERHILL RD ' (1) ·
'0.5MI EAST OF I-95 ' (1) ·
'0.6Mi S OF CR-812 ' (1) ·
'1 mile N of SR 794 Yamato' (1) ·
'2.6MI W OF SEMINOLE PRATT' (1) ·
'AT US-441 (SR-7) ' (1) ·
'AT US-441 SR-7 ' (1) ·
'Just North of Exit 48 ' (1) ·
'Just South of Exit 48 ' (1) ·
'Lake Ave / ICWW ' (1) ·
'Lake Ave. / ICWW ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 16 results in range #1 to #16.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)