Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BESSEY CREEK ' (1) ·
'CANAL ' (1) ·
'Cnl.Trib. to Turnbull Ck' (1) ·
'Danforth Creek ' (1) ·
'E-1 Canal ' (1) ·
'I 95 SR 9 ' (1) ·
'Kings Road ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'ORANGE CANAL ' (1) ·
'Pine Street ' (1) ·
'Reed Canal ' (1) ·
'Ryan's Canal ' (1) ·
'SR-524 ' (1) ·
'SR-528 ' (1) ·
'SR-76 & St. Lucie Canal ' (1) ·
'Trib To Turnbull Creek ' (1) ·
'Young Canal ' (1)
'Clint Moore Road ' (1) ·
'CR-726 CITRUS BLVD' (1) ·
'Hurley Blvd ' (1) ·
'KIMBERLY BLVD. WB ' (1) ·
'MURPHY RD ' (1) ·
'PINE RIDGE WAY ' (1) ·
'Reed Ca Prk Ent Rd' (1) ·
'ROYAL PLM BH BL NB' (1) ·
'ROYAL PLM BH BL SB' (1) ·
'SR-407 ' (1) ·
'SR-407 NB ' (1) ·
'SR-528 ' (1) ·
'SR-528 EB ' (1) ·
'SR-528 WB ' (1) ·
'SR-808 (Glades Rd)' (1) ·
'US-441 SR-15 ' (1) ·
'WB SR - 714 ' (1) ·
'Williams Road ' (1)
700085 (1) ·
700086 (1) ·
700087 (1) ·
700089 (1) ·
700090 (1) ·
700151 (1) ·
700216 (1) ·
705919 (1) ·
794061 (1) ·
794063 (1) ·
796500 (1) ·
890103 (1) ·
890112 (1) ·
890135 (1) ·
894029 (1) ·
930202 (1) ·
930401 (1) ·
934441 (1) ·
937361 (1) ·
937363 (1) ·
937714 (1)
'0.25 W of Turnbull Bay Rd' (1) ·
'0.2MI E OF US-441 (SR-7) ' (1) ·
'0.4MI NW OF HIGH MEADOW ' (1) ·
'0.6 MILE WEST OF US-1 ' (1) ·
'0.9 mile North of CR-40A ' (1) ·
'1 mi S of Malabar Rd ' (1) ·
'1 mile N of SR 794 Yamato' (1) ·
'2.2 Mi East of SR-528 ' (1) ·
'2.5 mi East of TPK Exit ' (1) ·
'2.7 MI WEST OF SR-9 I-95 ' (1) ·
'2.9 Mi East of SR-528 ' (1) ·
'2MI N OF OKEECHOBEE BLV ' (1) ·
'5.8Mi. E of SR-710 ' (1) ·
'50FT W OF VILLAGE BLVD ' (1) ·
'Intrsect w Reed Canal Rd ' (1) ·
'SR-407 NB at SR-528 WB ' (1) ·
'SR-528 EB over Pine St. ' (1) ·
'SR-528 WB over Pine St. ' (1) ·
'SR-808 at SR-7 Boca Raton' (1) ·
'US-441 and SR-76 ' (1)
26220386 (1) ·
26225797 (1) ·
26241735 (1) ·
26433224 (1) ·
26435320 (1) ·
26435409 (1) ·
26590720 (1) ·
27024321 (1) ·
27102072 (1) ·
27112563 (1) ·
27591529 (1) ·
28240437 (1) ·
28244125 (1) ·
28244206 (1) ·
28254595 (1) ·
28270757 (1) ·
28283186 (1) ·
28291220 (1) ·
29021899 (1) ·
29024857 (1) ·
29092052 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 21 results in range #1 to #21.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)