Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'AUSTRALIAN AVE NB ' (1) ·
'AUSTRALIAN AVE SB ' (1) ·
'Clint Moore Road ' (1) ·
'GOLDFINCH LANE ' (1) ·
'Hurley Blvd ' (1) ·
'KIMBERLY BLVD. WB ' (1) ·
'PIONEER ROAD ' (1) ·
'Port Malabar Bl EB' (1) ·
'SPARROW DRIVE ' (1) ·
'Spotted Fawn Way ' (1) ·
'SUNSET TRAIL ' (1) ·
'SW GREENRIDGE LANE' (1) ·
'Williams Road ' (1)
704203 (1) ·
705910 (1) ·
705919 (1) ·
794061 (1) ·
794063 (1) ·
894031 (1) ·
894049 (1) ·
930202 (1) ·
934221 (1) ·
934275 (1) ·
934276 (1) ·
934441 (1) ·
937354 (1) ·
937360 (1)
'0.1MI N OF SANDPIPER AVE.' (1) ·
'0.25 W of Turnbull Bay Rd' (1) ·
'0.2MI E OF US-441 (SR-7) ' (1) ·
'0.3MI W OF RYL PALM BH BL' (1) ·
'0.5MI EAST OF I-95 ' (1) ·
'0.6MI S of SW96 ST(CR76A)' (1) ·
'0.7MI WEST OF MAPP ROAD ' (1) ·
'0.9 mile North of CR-40A ' (1) ·
'1 mi S of Malabar Rd ' (1) ·
'1 mile N of SR 794 Yamato' (1) ·
'1.6 miles East of SR-507 ' (1) ·
'82FT EAST OF SR-7 ' (1) ·
'At Lake Washington Rd ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
N/A (1)
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)