Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Canal ' (1) ·
'Cnl.Trib. to Turnbull Ck' (1) ·
'CPB20 CANAL ' (1) ·
'Danforth Creek ' (1) ·
'Drainage Ditch ' (1) ·
'Indian River IWW ' (1) ·
'Intracoastal Waterway ' (1) ·
'Intracoastal Waterway ' (1) ·
'Kings Road ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'ORANGE CANAL ' (1) ·
'RELIEF CANAL ' (1) ·
'SR-524 ' (1) ·
'St Johns River ' (1) ·
'SWEETIE SLOUGH ' (1) ·
'Trib To Turnbull Creek ' (1) ·
'Turkey Creek ' (1) ·
'Young Canal ' (1)
'CR-726 CITRUS BLVD' (1) ·
'EB SR - 714 ' (1) ·
'EB SR 802 Lake Ave' (1) ·
'GOLDFINCH LANE ' (1) ·
'Hurley Blvd ' (1) ·
'KIMBERLY BLVD. WB ' (1) ·
'Port Malabar Bl EB' (1) ·
'SPARROW DRIVE ' (1) ·
'Spotted Fawn Way ' (1) ·
'SR-407 ' (1) ·
'SR-528 ' (1) ·
'SR-528 EB ' (1) ·
'SUNSET TRAIL ' (1) ·
'SW GREENRIDGE LANE' (1) ·
'US-192 WB ' (1) ·
'WB SR 802 Lake Ave' (1) ·
'Williams Road ' (1)
700084 (1) ·
700090 (1) ·
700150 (1) ·
700153 (1) ·
700174 (1) ·
700216 (1) ·
704203 (1) ·
705910 (1) ·
705919 (1) ·
794061 (1) ·
794063 (1) ·
890134 (1) ·
894029 (1) ·
894031 (1) ·
894049 (1) ·
930104 (1) ·
930318 (1) ·
934441 (1) ·
937354 (1) ·
937360 (1)
'0.1MI N OF SANDPIPER AVE.' (1) ·
'0.25 W of Turnbull Bay Rd' (1) ·
'0.2MI E OF US-441 (SR-7) ' (1) ·
'0.3MI W OF RYL PALM BH BL' (1) ·
'0.6 MILE WEST OF US-1 ' (1) ·
'0.6MI S of SW96 ST(CR76A)' (1) ·
'0.7MI WEST OF MAPP ROAD ' (1) ·
'0.9 mile North of CR-40A ' (1) ·
'1 mi S of Malabar Rd ' (1) ·
'1.6 miles East of SR-507 ' (1) ·
'2.2 Mi East of SR-528 ' (1) ·
'2.5 mi East of TPK Exit ' (1) ·
'2.9 Mi East of SR-528 ' (1) ·
'5.8Mi. E of SR-710 ' (1) ·
'At Lake Washington Rd ' (1) ·
'Lake Ave / ICWW ' (1) ·
'Lake Ave. / ICWW ' (1) ·
'SR-528 EB-St Johns River ' (1) ·
'SR-528 WB-St Johns River ' (1) ·
'US-192 WB-Indian River ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
N/A (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 20 results in range #1 to #20.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)