Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
700084 (1) ·
700085 (1) ·
700086 (1) ·
700087 (1) ·
700089 (1) ·
700090 (1) ·
700150 (1) ·
700151 (1) ·
700153 (1) ·
700172 (1) ·
700174 (1) ·
700216 (1) ·
704203 (1) ·
705910 (1) ·
705919 (1)
'0.2 Miles East of US-1 ' (1) ·
'0.6 MILE WEST OF US-1 ' (1) ·
'1 mi S of Malabar Rd ' (1) ·
'1.6 miles East of SR-507 ' (1) ·
'2.2 Mi East of SR-528 ' (1) ·
'2.7 MI WEST OF SR-9 I-95 ' (1) ·
'2.9 Mi East of SR-528 ' (1) ·
'At Lake Washington Rd ' (1) ·
'SR-407 NB at SR-528 WB ' (1) ·
'SR-528 EB over Pine St. ' (1) ·
'SR-528 EB-St Johns River ' (1) ·
'SR-528 WB over Pine St. ' (1) ·
'SR-528 WB-St Johns River ' (1) ·
'US-192 WB-Indian River ' (1)
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
N/A (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 15 results in range #1 to #15.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)