Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
ObjectID:
None (1) ·
55385 (1) ·
58625 (1) ·
58725 (1) ·
Boca Raton (1) ·
Boynton Beach (1) ·
Cape Canaveral (1) ·
Delray Beach (1) ·
Greenacres City (1) ·
Malabar (1) ·
Melbourne (1) ·
Ormond Beach (1) ·
Pahokee (1) ·
Palm Bay (1) ·
Palm Beach Gardens (1) ·
Royal Palm Beach village (1) ·
Sebastian (1) ·
Vero Beach (1) ·
West Melbourne (1) ·
West Palm Beach (1)
'BOYNTON CANAL C-16 ' (1) ·
'BRANCH OF MIAMI CANAL ' (1) ·
'C-15 Canal ' (1) ·
'Canal ' (1) ·
'CANAL C-24 ' (1) ·
'Canal to Bulow Creek ' (1) ·
'CITY OF WPB CANAL ' (1) ·
'COLLIER WATERWAY ' (1) ·
'CR 709 & FECRR ' (1) ·
'Deep Creek ' (1) ·
'Drainage Ditch ' (1) ·
'E-1-E CANAL ' (1) ·
'E-3 CANAL ' (1) ·
'ELKCAM WATERWAY ' (1) ·
'Galiano Rd & C-24 Canal ' (1) ·
'Galiano Rd. & C-24 Canal' (1) ·
'Gatlin Blvd ' (1) ·
'Groover Creek ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 (SR-9) ' (1) ·
'Intracoastal Waterway ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'MANATEE POCKET ' (1) ·
'MAPLE CREEK ' (1) ·
'Melb Tillman Canal 37 ' (1) ·
'Misner Branch ' (1) ·
'Palmetto Park Road ' (1) ·
'RELIEF CANAL ' (1) ·
'Service Rd & Canal ' (1) ·
'SFC CANAL NO 1 ' (1) ·
'SR-507 ' (1) ·
'SR-513 ' (1) ·
'SR-91 (FL TPK) ' (1) ·
'Ten Mile Creek ' (1) ·
'Trib to Groover Creek ' (1) ·
'W Camino Real ' (1) ·
'W. Camino Real ' (1)
Facility 007:
Number 008:
Location 009:
Latitude 016:
Longitude 017:
1000 (1) ·
10000 (1) ·
101 (1) ·
101000 (1) ·
102500 (1) ·
1030 (1) ·
10600 (1) ·
11321 (1) ·
1440 (1) ·
1500 (1) ·
1750 (1) ·
1854 (1) ·
19400 (1) ·
20000 (1) ·
21000 (1) ·
21500 (1) ·
23500 (1) ·
250 (1) ·
2500 (1) ·
27000 (1) ·
2871 (1) ·
32250 (1) ·
3240 (1) ·
3400 (1) ·
3600 (1) ·
36500 (1) ·
37250 (1) ·
38750 (1) ·
401 (1) ·
4484 (1) ·
4500 (1) ·
4580 (1) ·
49000 (1) ·
50 (1) ·
5792 (1) ·
5900 (1) ·
7200 (1) ·
8100 (1) ·
8400 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Future 114:
Showing below up to 53 results in range #1 to #53.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)
T
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch