Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
ObjectID:
'Banana River ' (1) ·
'Bulow Creek ' (1) ·
'C-104 CANAL ' (1) ·
'C-18 Canal ' (1) ·
'C-37 Canal ' (1) ·
'CANAL C-104 ' (1) ·
'Canal C-46 ' (1) ·
'CANAL E-1 ' (1) ·
'CANAL E-4 ' (1) ·
'COLLIER CREEK ' (1) ·
'E-3 CANAL ' (1) ·
'Indian River ' (1) ·
'Indian River Relief ' (1) ·
'Indian River Relief East' (1) ·
'Indian River West Relief' (1) ·
'L.W.D.D. E-4 CANAL ' (1) ·
'LEVEE NO.8 ' (1) ·
'Little Cow Creek ' (1) ·
'LWDD E-4 Canal ' (1) ·
'LWDD LATERAL 30 CANAL ' (1) ·
'LWDD LATERAL 32 CANAL ' (1) ·
'M-1 CANAL ' (1) ·
'Main Canal ' (1) ·
'Nova Canal ' (1) ·
'RIO MAR BAY ' (1) ·
'Rose Bay Canal ' (1) ·
'Samsula Canal ' (1) ·
'St. Johns River ' (1) ·
Canal (1) ·
Indian River ICW (1)
'Americana Blvd. ' (1) ·
'ARMONE PLACE ' (1) ·
'BARBER STREET ' (1) ·
'Big Tree Road ' (1) ·
'CONGRESS AVE NB ' (1) ·
'CONGRESS AVE SB ' (1) ·
'Cow Creek Road ' (1) ·
'CRESTWOOD BLVD. N ' (1) ·
'DUNN ROAD ' (1) ·
'Eldron Blvd. ' (1) ·
'GATEWAY BLVD (EB) ' (1) ·
'GATEWAY BLVD (WB) ' (1) ·
'Hunting Camp Road ' (1) ·
'Main Street ' (1) ·
'OLD GERMANTOWN RD ' (1) ·
'PEACHTREE BLVD. ' (1) ·
'Quantum Blvd. ' (1) ·
'Samsula Drive ' (1) ·
'SELVITZ ROAD ' (1) ·
'SR-404 EB ' (1) ·
'SR-404 WB ' (1) ·
'SR-50 EB ' (1) ·
'SR-50 WB ' (1) ·
'SR-518 ' (1) ·
'SR-528 ' (1) ·
'SR-60 Osceola Blvd' (1) ·
'SR-80WB (Southern)' (1) ·
'SW 15TH AVE ' (1) ·
'US 98 (SR 80) ' (1) ·
'VETERANS WALK ' (1) ·
'Walter Boardman Ln' (1) ·
'WB SR-710 ' (1) ·
Fiske Blvd Ramps (1) ·
SR-518 (1)
Number 008:
'0.19Mi. E of Congress Ave' (1) ·
'0.2 MI S OF LAKE IDA ROAD' (1) ·
'0.2 mile East of US-1 ' (1) ·
'0.2MI S OF LAKE IDA ROAD ' (1) ·
'0.2MI W OF I-95 ' (1) ·
'0.2MI. W of NW STJAMES DR' (1) ·
'0.3MI E OF CONGRESS BLVD ' (1) ·
'0.3MI W OF ROYAL PALM BL ' (1) ·
'0.4 MI W OF CONGRESS AVE ' (1) ·
'0.5MI S of CR 712 ' (1) ·
'0.5MI S of CR-712 ' (1) ·
'0.6 Mile South of SR-442 ' (1) ·
'0.8 MI N OF LAKE IDA ROAD' (1) ·
'0.9 mi E of Old Dixie Hwy' (1) ·
'1.0 mi. S of SR-44 ' (1) ·
'1.0MI E OF BANANA RIV DR ' (1) ·
'1.1MI N of CR 512 ' (1) ·
'1.3 miles South of SR-44 ' (1) ·
'100 ft E of Minton Road ' (1) ·
'2.0Mi. S of Malabar Rd NE' (1) ·
'2.25Mi. W of US-1 ' (1) ·
'3 Miles West of SR-786 ' (1) ·
'AT SR-7 US-441 ' (1) ·
'INSIDE RIVERSIDE PARK ' (1) ·
'PUMP STA AT 20 MI BEND ' (1) ·
'Southern Blvd / E-3 Canal' (1) ·
'SR-404 EB - Banana River ' (1) ·
'SR-404 EB - Indian River ' (1) ·
'SR-404 EB -Indian Riv Rel' (1) ·
'SR-404 WB - Banana River ' (1) ·
'SR-404 WB - Indian River ' (1) ·
'SR-404 WB-Indian River ' (1) ·
'SR-50 EB -St Johns River ' (1) ·
'SR-50 WB -St Johns River ' (1) ·
'SR-518 - Indian River Rel' (1) ·
'SR-5A - Big Tree Rd ' (1) ·
I-95 SB Fiske Blvd Ramp (1) ·
SR-518 over Indian River (1)
Latitude 016:
Longitude 017:
10 (1) ·
1000 (1) ·
1040 (1) ·
1120 (1) ·
120 (1) ·
1200 (1) ·
13500 (1) ·
1711 (1) ·
18000 (1) ·
19500 (1) ·
21000 (1) ·
23000 (1) ·
25170 (1) ·
2880 (1) ·
29000 (1) ·
3100 (1) ·
33000 (1) ·
35500 (1) ·
37500 (1) ·
3767 (1) ·
43 (1) ·
44000 (1) ·
4689 (1) ·
5400 (1) ·
5850 (1) ·
594 (1) ·
600 (1) ·
605 (1) ·
6900 (1) ·
7150 (1) ·
75 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the culvert. Insignificant scrape marks caused by drift. (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing by assessment, by calculation or by installation of properly designed countermeasures (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
10150 (1) ·
1050 (1) ·
11972 (1) ·
12405 (1) ·
1735 (1) ·
20 (1) ·
2070 (1) ·
2082 (1) ·
21600 (1) ·
23422 (1) ·
31462 (1) ·
33832 (1) ·
3470 (1) ·
3600 (1) ·
36435 (1) ·
39905 (1) ·
50315 (1) ·
52 (1) ·
5378 (1) ·
5420 (1) ·
57255 (1) ·
61592 (1) ·
6408 (1) ·
65063 (1) ·
719 (1) ·
76340 (1) ·
850 (1) ·
91 (1) ·
9369 (1)
Showing below up to 42 results in range #1 to #42.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)
T
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch