Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'AUSTRALIAN AVE NB ' (1) ·
'AUSTRALIAN AVE SB ' (1) ·
'BARBER STREET ' (1) ·
'CR 613 (58TH AVE) ' (1) ·
'CR714 PALM CITY RD' (1) ·
'CRESTWOOD BLVD. N ' (1) ·
'DUNN ROAD ' (1) ·
'FLEMING STREET ' (1) ·
'GATEWAY BLVD (EB) ' (1) ·
'GATEWAY BLVD (WB) ' (1) ·
'PEACHTREE BLVD. ' (1) ·
'SELVITZ ROAD ' (1) ·
'ST LUCIE W BLVD WB' (1) ·
'US 98 (SR 80) ' (1)
884055 (1) ·
885602 (1) ·
885604 (1) ·
890039 (1) ·
930439 (1) ·
934277 (1) ·
935307 (1) ·
935308 (1) ·
937367 (1) ·
937707 (1) ·
945269 (1) ·
945270 (1) ·
945271 (1) ·
949901 (1)
'0.1MI W OF BAYSHORE BLVD.' (1) ·
'0.2MI. W of NW STJAMES DR' (1) ·
'0.3MI E OF CONGRESS BLVD ' (1) ·
'0.3MI N of CR 512 ' (1) ·
'0.3MI W OF ROYAL PALM BL ' (1) ·
'0.4MI N OF 49TH ST. ' (1) ·
'0.5MI S of CR 712 ' (1) ·
'0.5MI S of CR-712 ' (1) ·
'0.5MI S OF P.B. LAKES BLV' (1) ·
'1/2MI S of US-1 ' (1) ·
'150FT N OF JOYHAVEN DR ' (1) ·
'Southern Blvd / E-3 Canal' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)