Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CANAL E-4 ' (1) ·
'COLLIER CREEK ' (1) ·
'CR-515 & Indian River ' (1) ·
'ELKCAM WATERWAY ' (1) ·
'Indian River ' (1) ·
'Intracoastal Waterway ' (1) ·
'L.W.D.D. E-4 CANAL ' (1) ·
'LEVEE NO.8 ' (1) ·
'LWDD E-4 Canal ' (1) ·
'LWDD LATERAL 30 CANAL ' (1) ·
'LWDD LATERAL 32 CANAL ' (1) ·
'N RELIEF CANAL ' (1) ·
'Nova Canal ' (1) ·
'POPPELTON CREEK ' (1) ·
'US-1 & FECRR ' (1)
'BARBER STREET ' (1) ·
'Big Tree Road ' (1) ·
'CONGRESS AVE NB ' (1) ·
'CONGRESS AVE SB ' (1) ·
'CR 613 (58TH AVE) ' (1) ·
'CR714 PALM CITY RD' (1) ·
'FLEMING STREET ' (1) ·
'GATEWAY BLVD (EB) ' (1) ·
'GATEWAY BLVD (WB) ' (1) ·
'Harrison Street ' (1) ·
'OLD GERMANTOWN RD ' (1) ·
'Quantum Blvd. ' (1) ·
'SR-510(Wabasso Rd)' (1) ·
'SR-528 EB ' (1) ·
'SR-80WB (Southern)' (1)
700108 (1) ·
700109 (1) ·
705100 (1) ·
794154 (1) ·
880053 (1) ·
884055 (1) ·
885602 (1) ·
885604 (1) ·
890039 (1) ·
930407 (1) ·
934482 (1) ·
934930 (1) ·
934931 (1) ·
934932 (1) ·
934933 (1) ·
935307 (1) ·
935308 (1) ·
936375 (1)
'0.19Mi. E of Congress Ave' (1) ·
'0.1MI E of Riveredge Blvd' (1) ·
'0.2 MI S OF LAKE IDA ROAD' (1) ·
'0.2MI S OF LAKE IDA ROAD ' (1) ·
'0.3MI E OF CONGRESS BLVD ' (1) ·
'0.3MI N of CR 512 ' (1) ·
'0.4 MI W OF CONGRESS AVE ' (1) ·
'0.4MI N OF 49TH ST. ' (1) ·
'0.8 MI N OF LAKE IDA ROAD' (1) ·
'1.4MI E OF US-1 ' (1) ·
'1/2MI S of US-1 ' (1) ·
'150FT N OF JOYHAVEN DR ' (1) ·
'PUMP STA AT 20 MI BEND ' (1) ·
'SR-528 EB - US-1& FECRR ' (1) ·
'SR-528 EB over CR-515 ' (1) ·
'SR-5A - Big Tree Rd ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
N/A (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the culvert. Insignificant scrape marks caused by drift. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 18 results in range #1 to #18.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)