Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Banana River Drive ' (1) ·
'Banana River Relief ' (1) ·
'BOYNTON CANAL C-16 ' (1) ·
'CANAL C-24 ' (1) ·
'CLEAR LAKE ' (1) ·
'CR-515 & Indian River ' (1) ·
'ELKCAM WATERWAY ' (1) ·
'Intracoastal Waterway ' (1) ·
'MAPLE CREEK ' (1) ·
'S Fork St. Lucie River ' (1) ·
'SFC CANAL NO 1 ' (1) ·
'SR-3 ' (1) ·
'Sykes Creek ' (1) ·
'Tillman Canal ' (1) ·
'US-1 & FECRR ' (1)
'AUSTRALIAN AVE NB ' (1) ·
'AUSTRALIAN AVE SB ' (1) ·
'Aviation Ave. ' (1) ·
'BARBER STREET ' (1) ·
'CONGRESS AVE ' (1) ·
'EB Martin Downs Bd' (1) ·
'Eldron Blvd ' (1) ·
'FLORESTA DR ' (1) ·
'MAPP RD ' (1) ·
'SOUTH BEND BLVD. ' (1) ·
'SR-528 ' (1) ·
'SR-528 EB ' (1) ·
'Sykes Creek Pkwy ' (1) ·
'W LAKE RD CR-717 ' (1) ·
'WB PGA Blvd. ' (1)
700108 (1) ·
700109 (1) ·
700111 (1) ·
700112 (1) ·
700113 (1) ·
700114 (1) ·
704011 (1) ·
705907 (1) ·
705908 (1) ·
885602 (1) ·
890038 (1) ·
894033 (1) ·
930349 (1) ·
934277 (1) ·
934491 (1) ·
934505 (1) ·
937707 (1) ·
944008 (1) ·
945251 (1)
'.8 Mile North of SR-520 ' (1) ·
'0.2MI S OF FLORESTA DR ' (1) ·
'0.5 mi N of Malabar Rd. ' (1) ·
'0.5 mi N of Malabar Road ' (1) ·
'0.5MI Nof PT ST LUCIE BLD' (1) ·
'0.5MI S OF P.B. LAKES BLV' (1) ·
'0.8Mi NORTH OF CR-804 ' (1) ·
'1.8MI W OF SR-15 ' (1) ·
'1.9MI S of CR-714 ' (1) ·
'1000'W of SR5 & E ofSR811' (1) ·
'150FT N OF JOYHAVEN DR ' (1) ·
'2.55 Miles East of SR-3 ' (1) ·
'2.85 Miles East of SR-3 ' (1) ·
'SR-528 EB - Sykes Creek ' (1) ·
'SR-528 EB - US-1& FECRR ' (1) ·
'SR-528 EB over CR-515 ' (1) ·
'SR-528 EB over SR-3 ' (1) ·
'SR-714 East of Fla. Tpke.' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1) ·
Countermeasures have been installed to mitigate an existing problem with scour and to reduce the risk of bridge failure during a flood event. Instructions contained in a plan of action have been implemented to reduce the risk to users from a bridge failure during or immediately after a flood event. (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)