Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Cabbage Slough ' (1) ·
'Canal ' (1) ·
'CPB20 CANAL ' (1) ·
'DANFORTH CREEK ' (1) ·
'El Rio Canal E-4 ' (1) ·
'FECRR ' (1) ·
'HUNGERFORD CANAL ' (1) ·
'Indian River ' (1) ·
'LWDD E-4 CANAL ' (1) ·
'Outfall Ditch ' (1) ·
'RELIEF CANAL ' (1) ·
'St Johns River Relief ' (1) ·
'SWEETIE SLOUGH ' (1) ·
I-95 (1)
'AUDUBON BLVD. ' (1) ·
'GOLDFINCH LANE ' (1) ·
'I-95 ' (1) ·
'SPARROW DRIVE ' (1) ·
'SR-405 ' (1) ·
'SR-405 EB ' (1) ·
'SR-405 WB ' (1) ·
'SR-46 ' (1) ·
'SR-520 EB ' (1) ·
'SR-808 (Glades Rd)' (1) ·
'SUNSET TRAIL ' (1) ·
'SW GREENRIDGE LANE' (1) ·
'WEST OCEAN DRIVE ' (1) ·
Grant Rd. (1) ·
Micco Rd. (1)
700002 (1) ·
700097 (1) ·
700103 (1) ·
700137 (1) ·
700157 (1) ·
700158 (1) ·
700167 (1) ·
790028 (1) ·
790029 (1) ·
894031 (1) ·
894049 (1) ·
930319 (1) ·
935300 (1) ·
935502 (1) ·
937354 (1) ·
937360 (1)
'0.1MI N OF SANDPIPER AVE.' (1) ·
'0.2 MI W OF LINDELL BLVD ' (1) ·
'0.3MI W OF RYL PALM BH BL' (1) ·
'0.4MI E OF CONGRESS AVE ' (1) ·
'0.6MI S of SW96 ST(CR76A)' (1) ·
'0.7 Mi S of SR-50 ' (1) ·
'0.7MI WEST OF MAPP ROAD ' (1) ·
'1.4 miles east of I-95 ' (1) ·
'2.2 Mi. S of Grant Rd. ' (1) ·
'SR 520 EB - Indian River ' (1) ·
'SR-405 EB - FECRR ' (1) ·
'SR-405 WB - FECRR ' (1) ·
'SR-46 - Cabbage Slough ' (1) ·
'SR-46 - St. Johns Riv. R ' (1) ·
1.3 Mi. East of CR-507 (1) ·
1.9MI E of Babcock St. (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
N/A (1)
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 16 results in range #1 to #16.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)