Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BESSEY CREEK ' (1) ·
'BRANCH OF C-44 CANAL ' (1) ·
'CANAL ' (1) ·
'Danforth Creek ' (1) ·
'DRAINAGE CANAL ' (1) ·
'E-1 Canal ' (1) ·
'Halifax River IWW ' (1) ·
'I-95 ' (1) ·
'Lake Ashby Canal ' (1) ·
'LIPTOG CANAL ' (1) ·
'Reed Canal ' (1) ·
'SFWMD L-13 CANAL ' (1) ·
'SR-76 & St. Lucie Canal ' (1) ·
'Tomoka River ' (1) ·
'WPB WATER SUPPLY CANAL ' (1)
'Berry Avenue ' (1) ·
'CR-700 ' (1) ·
'CR-880 ' (1) ·
'CR726(CITRUS BLVD)' (1) ·
'Fay Blvd. ' (1) ·
'Lake Ashby Road ' (1) ·
'LPGA Blvd ' (1) ·
'MURPHY RD ' (1) ·
'PINE RIDGE WAY ' (1) ·
'Reed Ca Prk Ent Rd' (1) ·
'ROYAL PLM BH BL NB' (1) ·
'ROYAL PLM BH BL SB' (1) ·
'SE HARBOR ISLAND ' (1) ·
'SR-40 ' (1) ·
'SR-808 (Glades Rd)' (1) ·
'STAR ISLAND WAY ' (1) ·
'US-441 SR-15 ' (1) ·
'VILLAGE BLVD ' (1) ·
'VILLAGE BLVD (NB) ' (1) ·
'VILLAGE BLVD (SB) ' (1) ·
'WB SR - 714 ' (1)
704161 (1) ·
790132 (1) ·
794038 (1) ·
794146 (1) ·
796500 (1) ·
890015 (1) ·
890103 (1) ·
890112 (1) ·
890135 (1) ·
894017 (1) ·
894018 (1) ·
894054 (1) ·
930085 (1) ·
930401 (1) ·
930910 (1) ·
937361 (1) ·
937363 (1) ·
937710 (1) ·
937711 (1) ·
937712 (1) ·
937714 (1)
'0.1 Mile S of CR-714 ' (1) ·
'0.2Mi E of GOMEZ AVE. ' (1) ·
'0.3Mi E of GOMEZ AVE. ' (1) ·
'0.4 Mile West of I-95 ' (1) ·
'0.4MI NW OF HIGH MEADOW ' (1) ·
'0.8MI S OF 45TH ST CR702 ' (1) ·
'2.5 mi East of TPK Exit ' (1) ·
'200ft. East of SR-415 ' (1) ·
'2MI N OF OKEECHOBEE BLV ' (1) ·
'2Mi S of 45TH ST CR-702 ' (1) ·
'3.6 Mi. E of SR-710 ' (1) ·
'50FT W OF VILLAGE BLVD ' (1) ·
'7.7Mi W OF SR-80 ' (1) ·
'Fay Blvd. - I-95 ' (1) ·
'INT. OF CR-700 & CR-880 ' (1) ·
'Intrsect w Reed Canal Rd ' (1) ·
'SR-40 over IWW ' (1) ·
'SR-808 at SR-7 Boca Raton' (1) ·
'US-441 and SR-76 ' (1)
26220386 (1) ·
26404133 (1) ·
26410475 (1) ·
26433224 (1) ·
26435320 (1) ·
26435409 (1) ·
26440062 (1) ·
26440066 (1) ·
26445867 (1) ·
26590720 (1) ·
27020590 (1) ·
27044012 (1) ·
27044356 (1) ·
27093790 (1) ·
27102072 (1) ·
27112563 (1) ·
28275318 (1) ·
28563087 (1) ·
29092052 (1) ·
29130195 (1) ·
29171420 (1)
80052862 (1) ·
80053153 (1) ·
80053241 (1) ·
80060815 (1) ·
80080433 (1) ·
80080562 (1) ·
80121129 (1) ·
80133989 (1) ·
80134000 (1) ·
80161373 (1) ·
80170910 (1) ·
80175123 (1) ·
80232525 (1) ·
80241142 (1) ·
80303079 (1) ·
80370127 (1) ·
80491666 (1) ·
81005885 (1) ·
81030614 (1) ·
81060951 (1) ·
81063403 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 21 results in range #1 to #21.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)