Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BRANCH OF ICWW ' (1) ·
'C STANLEY WEAVER CANAL ' (1) ·
'EL RIO CANAL ' (1) ·
'I-95 ' (1) ·
'IRRIGATION DITCH #4 ' (1) ·
'LAKE MANGONIA CANAL ' (1) ·
'LOXAHATCHEE RIV NW FORK ' (1) ·
'M-2 CANAL ' (1) ·
'ROEBUCK CREEK ' (1) ·
'S-135 Canal ' (1) ·
'SCOTTS CANAL ' (1) ·
'Turnbull Creek ' (1) ·
'WARNER CREEK ' (1) ·
'WPB CANAL C-51 ' (1)
'CAMINO REAL ' (1) ·
'CARTER RD. ' (1) ·
'HAGEN RANCH ROAD ' (1) ·
'ISLAND WAY ' (1) ·
'JUPITER ISLAND PK ' (1) ·
'LOCKS ROAD ' (1) ·
'LPGA Blvd ' (1) ·
'MONET ROAD ' (1) ·
'OKEECHOBEE BLVD. ' (1) ·
'PALM B LAKE BVD EB' (1) ·
'SUMMIT BLVD ' (1) ·
'SW Wood St. ' (1) ·
'TROPICALIA AVE. ' (1) ·
'Turnbull Bay Road ' (1)
790171 (1) ·
794022 (1) ·
884015 (1) ·
890800 (1) ·
894044 (1) ·
894050 (1) ·
894052 (1) ·
934126 (1) ·
934201 (1) ·
934240 (1) ·
934950 (1) ·
934960 (1) ·
936551 (1) ·
937706 (1)
'0.1MI W OF SEM PRATT WHIT' (1) ·
'0.2 MI West of US-98 ' (1) ·
'0.2Mi E of CR-723 ' (1) ·
'0.2MI E OF PROSPERITY FM ' (1) ·
'0.4 MI W of US-1 ' (1) ·
'0.5MI N OF JUPITER BCH RD' (1) ·
'0.5Mi N of PLMBCH CO LINE' (1) ·
'0.5Mi W of SR-76 ' (1) ·
'0.6Mi W OF AUSTRALIAN AVE' (1) ·
'0.8MI N OF BOYNTON BCH BD' (1) ·
'1.9 Miles West of US-1 ' (1) ·
'2.4MI S OF SR-60@90TH AVE' (1) ·
'500FT WEST OF I-95 ' (1) ·
'LPGA Blvd. at I-95 ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)