Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-17 CANAL ' (1) ·
'C-51 Canal ' (1) ·
'E-1 CANAL ' (1) ·
'E-3 Canal ' (1) ·
'EL RIO CANAL ' (1) ·
'El Rio Canal E-4 ' (1) ·
'HILLSBORO CANAL L-14 ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 (SR-9) ' (1) ·
'Intracoastal Waterway ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD LATERAL 14 CANAL ' (1) ·
'MAIN CANAL ' (1) ·
'OCEAN CANAL L-13 ' (1) ·
'TEN MILE CREEK ' (1) ·
'W. Relief Indian River ' (1)
'45TH STREET ' (1) ·
'COUNTRY CLUB DRIVE' (1) ·
'EB PGA Blvd. ' (1) ·
'EB SR 704 ' (1) ·
'GORDY ROAD ' (1) ·
'Haverhill Rd ' (1) ·
'Jensen Bch. Cswy. ' (1) ·
'LAKERIDGE BLVD ' (1) ·
'LYONS ROAD ' (1) ·
'PALMETTO PARK RD. ' (1) ·
'PALMETTO PARK ROAD' (1) ·
'PALMETTO PK RD EB ' (1) ·
'PALMETTO PK RD WB ' (1) ·
'S. VERDE TRAIL ' (1) ·
'SAM SENTER RD ' (1) ·
'SE 7TH STREET ' (1) ·
'SR806 Atlantic Ave' (1) ·
'W/B S.R. 704 ' (1) ·
'West Atlantic Ave.' (1)
884053 (1) ·
890138 (1) ·
930069 (1) ·
930106 (1) ·
930183 (1) ·
930210 (1) ·
930240 (1) ·
934100 (1) ·
934295 (1) ·
934313 (1) ·
934464 (1) ·
934465 (1) ·
934513 (1) ·
934903 (1) ·
934908 (1) ·
934924 (1) ·
934927 (1) ·
935100 (1) ·
944010 (1)
'.7mi. E of Congress Ave. ' (1) ·
'0.2 Mi. E OF I-95 ' (1) ·
'0.2MI E OF US-441 (SR-7) ' (1) ·
'0.5 MI. E OF SR-80 ' (1) ·
'0.7MI W OF US-1 ' (1) ·
'0.7MI WEST OF US-1 ' (1) ·
'0.8 MILE EAST OF US-1 ' (1) ·
'0.8MI N OF LANTANA ROAD ' (1) ·
'0.8MI SOUTH OF SR-70 ' (1) ·
'1/2 mile W of SR-809 ' (1) ·
'1000'W of SR5 & E ofSR811' (1) ·
'50FT. S OF 30TH STREET ' (1) ·
'6MI E OF BELLE GLADE ' (1) ·
'At S Military Trail ' (1) ·
'Just W. of Congress Ave.' (1) ·
'PALMETTO PK RD US-441 SR7' (1) ·
'S of Southrn/Haverhll Int' (1) ·
'W. of Jensen Bch. Cswy. ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)