Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'I-4 EB ' (1) ·
'I-4 WB ' (1) ·
'MAPP RD ' (1) ·
'PALMETTO PK RD EB ' (1) ·
'PALMETTO PK RD WB ' (1) ·
'Pinehurst Ave N ' (1) ·
'SAM SENTER RD ' (1) ·
'SE 7TH STREET ' (1) ·
'SOUTH BEND BLVD. ' (1) ·
'SR-520 WB ' (1) ·
'SR519NB(Fiske Blv)' (1) ·
'SR519SB(Fiske Blv)' (1) ·
'Tomoka Farms Rd. ' (1) ·
'US-192 WB ' (1) ·
'W LAKE RD CR-717 ' (1)
700023 (1) ·
700061 (1) ·
700126 (1) ·
700176 (1) ·
704045 (1) ·
790022 (1) ·
790105 (1) ·
790107 (1) ·
894033 (1) ·
934464 (1) ·
934465 (1) ·
934505 (1) ·
934513 (1) ·
935100 (1) ·
945251 (1)
'0.2MI S OF FLORESTA DR ' (1) ·
'0.5 MI. E OF SR-80 ' (1) ·
'0.7MI W OF US-1 ' (1) ·
'0.7MI WEST OF US-1 ' (1) ·
'0.9 mi N of Wickham Rd ' (1) ·
'1.8MI W OF SR-15 ' (1) ·
'1.9MI S of CR-714 ' (1) ·
'6MI E OF BELLE GLADE ' (1) ·
'I-4 EB over I-95 ' (1) ·
'I-4 WB over I-95 ' (1) ·
'SR 520 WB Indian River ' (1) ·
'SR-519 NB I-95 ' (1) ·
'SR-519 SB I-95 ' (1) ·
'Tomoka Farms Rd - I-4 ' (1) ·
'US-192 WB-St Johns Relief' (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 15 results in range #1 to #15.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)