Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BARBARA BASIN ' (1) ·
'BRANCH OF INDIAN RIVER ' (1) ·
'C-51 Canal ' (1) ·
'CHENEY WAY/CSX RR ' (1) ·
'FORK OF ST. LUCIE RIVER ' (1) ·
'Frazier Creek ' (1) ·
'HILLSBORO L-14 CANAL ' (1) ·
'LATERAL A CANAL ' (1) ·
'MAIN CANAL ' (1) ·
'NORTH CANAL ' (1) ·
'PARK LATERAL CANAL ' (1) ·
'ROY'S SWALE ' (1) ·
'SFWMD C-15 CANAL ' (1) ·
'SR 802 LAKE WORTH RD ' (1) ·
'St. Lucie River ' (1)
'101ST STREET ' (1) ·
'61ST./PECAN GROVE ' (1) ·
'BRANT DR/CARL BOTT' (1) ·
'CONGRESS AVE (NB) ' (1) ·
'CONGRESS AVE (SB) ' (1) ·
'EB SR60 ' (1) ·
'INDIAN RIV BLVD NB' (1) ·
'INDIAN RIV BLVD SB' (1) ·
'ISLAND RD. ' (1) ·
'NW 5TH STREET ' (1) ·
'OUSLEY FARMS ROAD ' (1) ·
'PRIMA VISTA BLVD. ' (1) ·
'SILVER FOX LANE ' (1) ·
'SIMARA STREET ' (1) ·
'SR 707 (Dixie Hwy)' (1) ·
'SR-5 (US-1) ' (1) ·
'SR-60 WB ' (1) ·
'SR91 N/S TPK 93.3 ' (1)
884038 (1) ·
884057 (1) ·
884058 (1) ·
884059 (1) ·
884060 (1) ·
884063 (1) ·
890002 (1) ·
890003 (1) ·
894042 (1) ·
895501 (1) ·
895505 (1) ·
930030 (1) ·
931001 (1) ·
934155 (1) ·
934156 (1) ·
934299 (1) ·
935501 (1) ·
944011 (1) ·
944012 (1)
'.2MI S of LINDELL BLVD ' (1) ·
'0.25MI E OF SEWALLS PT RD' (1) ·
'0.3MI W OF CR-507 ' (1) ·
'0.4 MI W of SR-7 (US-441)' (1) ·
'0.4MI N OF SR-60 ' (1) ·
'0.4MI. N OF SR-60 ' (1) ·
'0.5MI N OF 45TH STREET ' (1) ·
'0.5Mi S of SR-710 ' (1) ·
'0.8 MI W OF US-1 ' (1) ·
'0.9 MI W OF US-1 ' (1) ·
'1/4Mi W of New Roosevelt ' (1) ·
'100FT Eof SEWALLS PT. RD.' (1) ·
'2.0 MILES N OF SR 812 ' (1) ·
'AT CR-615 (66TH AVE.) ' (1) ·
'At US-441 Southern Blvd ' (1) ·
'SR-5 S of Roosevelt BR ' (1) ·
'SR-60 1.6MILES W. OF A1A ' (1) ·
'SR60 1.6Miles W. of A1A ' (1)
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)