Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BOYNTON CANAL ' (1) ·
'C-15 CANAL ' (1) ·
'C-51 Canal ' (1) ·
'C. Stanley Weaver Canal ' (1) ·
'CYPRESS CREEK ' (1) ·
'DANFORTH CREEK ' (1) ·
'DIRT FARM ROAD ' (1) ·
'L-38 CANAL ' (1) ·
'Lake Gertie ' (1) ·
'LATERAL A CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD LAT 30 CANAL ' (1) ·
'M-1 CANAL ' (1) ·
'PARK LATERAL CANAL ' (1) ·
'QUAIL COVEY ROAD ' (1) ·
'RCA CANAL ' (1) ·
'RELIEF CANAL ' (1) ·
'Sykes Creek ' (1) ·
'Tomoka River ' (1) ·
'WARNER CREEK ' (1)
'101ST STREET ' (1) ·
'61ST./PECAN GROVE ' (1) ·
'BARWICK RD ' (1) ·
'CR-619 82ND AVE. ' (1) ·
'CR-713 ' (1) ·
'CR-92 WB ' (1) ·
'DIXIE HIGHWAY ' (1) ·
'HYPOLUXO ROAD EB ' (1) ·
'JOG ROAD (SB) ' (1) ·
'JOG ROAD SB ' (1) ·
'LINTON BLVD. ' (1) ·
'MILITARY TR. NB ' (1) ·
'MILITARY TR. SB ' (1) ·
'OKEECHOBEE RD WB ' (1) ·
'OLD DIXIE HWY ' (1) ·
'Old Dixie Hwy. ' (1) ·
'OUSLEY FARMS ROAD ' (1) ·
'PALMWOOD ROAD ' (1) ·
'PROS. FARMS ROAD ' (1) ·
'Sea Ray Drive ' (1) ·
'Woolbright Road EB' (1) ·
'Woolbright Road WB' (1)
704144 (1) ·
794016 (1) ·
794121 (1) ·
884020 (1) ·
884038 (1) ·
884063 (1) ·
890113 (1) ·
894009 (1) ·
934136 (1) ·
934139 (1) ·
934222 (1) ·
934299 (1) ·
934346 (1) ·
934455 (1) ·
934468 (1) ·
934469 (1) ·
934483 (1) ·
934911 (1) ·
934913 (1) ·
934918 (1) ·
934934 (1) ·
934935 (1)
'0.1MI N of DONALD ROSS RD' (1) ·
'0.2MI SOUTH OF CR-714 ' (1) ·
'0.2MI W OF ROYAL P.B. BLV' (1) ·
'0.3MI W OF CR-507 ' (1) ·
'0.4 mi S of Addison Drive' (1) ·
'0.4 Mi West of US 17-92 ' (1) ·
'0.7MI W OF CONGRESS AVE ' (1) ·
'0.7MI W OF CONGRESS AVE.' (1) ·
'0.7MI N OF BOYNTON BH BL ' (1) ·
'0.7MI N OF LAKE IDA ROAD ' (1) ·
'0.7Mi N OF SR-804 ' (1) ·
'0.8Mi W of JOG/CARTER RD.' (1) ·
'1.0MI W OF MILITARY TRAIL' (1) ·
'1.1MI S OF LINTON BLVD ' (1) ·
'1.2Mi. E of Savannah Rd. ' (1) ·
'1.9mi W of N Banana Ri Dr' (1) ·
'1MI S. OF LINTON BLVD ' (1) ·
'2.6MI N OF SR-60 ' (1) ·
'AT CR-615 (66TH AVE.) ' (1) ·
'At US-441 Southern Blvd ' (1) ·
'S SIDE OF RCA/MONET ROAD ' (1)
26252148 (1) ·
26252706 (1) ·
26262125 (1) ·
26290216 (1) ·
26304774 (1) ·
26304823 (1) ·
26322014 (1) ·
26322087 (1) ·
26342010 (1) ·
26405650 (1) ·
26422263 (1) ·
26501410 (1) ·
26530408 (1) ·
27092679 (1) ·
27132086 (1) ·
27403887 (1) ·
27421622 (1) ·
27464527 (1) ·
28242068 (1) ·
29031702 (1) ·
29203187 (1)
80042035 (1) ·
80043190 (1) ·
80043488 (1) ·
80060834 (1) ·
80060838 (1) ·
80065226 (1) ·
80072177 (1) ·
80072244 (1) ·
80074643 (1) ·
80084773 (1) ·
80085039 (1) ·
80092461 (1) ·
80135221 (1) ·
80135984 (1) ·
80170170 (1) ·
80174730 (1) ·
80274430 (1) ·
80294317 (1) ·
80365186 (1) ·
80413919 (1) ·
81051074 (1) ·
81184073 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
Bridge closed because of channel failure. Corrective action may put back in light service. (1) ·
N/A (1)
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 22 results in range #1 to #22.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)