Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BRANT DR/CARL BOTT' (1) ·
'COLUMBUS DR. ' (1) ·
'DARWIN BLVD ' (1) ·
'GETTYSBURG DR ' (1) ·
'GRANDVIEW WAY ' (1) ·
'JEANNE AVE ' (1) ·
'KESTOR DR ' (1) ·
'NORTH QUICK CIRCLE' (1) ·
'NW 20TH ST. EB ' (1) ·
'NW 5TH STREET ' (1) ·
'PAAR DR ' (1) ·
'PAAR DR. ' (1) ·
'PORT ST LUCIE BLVD' (1) ·
'ROYAL PLM BH BL SB' (1) ·
'SAVAGE BLVD. ' (1) ·
'SAVONA BLVD. ' (1) ·
'UNDALLO RD ' (1)
930030 (1) ·
934420 (1) ·
935501 (1) ·
937362 (1) ·
937366 (1) ·
945255 (1) ·
945257 (1) ·
945258 (1) ·
945259 (1) ·
945260 (1) ·
945261 (1) ·
945262 (1) ·
945263 (1) ·
945264 (1) ·
945265 (1) ·
945266 (1) ·
945267 (1)
'.2MI S of LINDELL BLVD ' (1) ·
'0.1MI N OF BELVEDERE ROAD' (1) ·
'0.1MI W of N QUICK CIRCLE' (1) ·
'0.3M N OF OKEECHOBEE BLV ' (1) ·
'0.3MI E OF DARWIN BLVD ' (1) ·
'0.3MI W of DARWIN BLVD. ' (1) ·
'0.4 MI W of SR-7 (US-441)' (1) ·
'0.4MI S OF PAAR DRIVE ' (1) ·
'0.4MI W OF PORT ST LUCIE ' (1) ·
'0.5MI W of N DIXIE HWY ' (1) ·
'0.5Mi S of PAAR DRIVE ' (1) ·
'0.7MI S OF PAAR DRIVE ' (1) ·
'0.7MI Wof SW DARWIN BLVD.' (1) ·
'0.8MI N OF SW BECKER RD ' (1) ·
'0.9MI S OF PAAR DRIVE ' (1) ·
'1.2MI W OF PORT ST. LUCIE' (1) ·
'1.6MI N OF GATLIN BLVD. ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)