Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Bulow Creek ' (1) ·
'CANAL ' (1) ·
'CANAL E-1 ' (1) ·
'Canal L-14 ' (1) ·
'COUNTY LINE CANAL C-23 ' (1) ·
'H-20 CANAL ' (1) ·
'LATERAL C CANAL ' (1) ·
'LATERAL CANAL D ' (1) ·
'Little Cow Creek ' (1) ·
'LWDD LATERAL 30 CANAL ' (1) ·
'LWDD LATERAL 32 CANAL ' (1) ·
'N RELIEF CANAL ' (1) ·
'PARK LATERAL CANAL ' (1) ·
'Samsula Canal ' (1)
'74TH AVE. ' (1) ·
'8TH ST. CR-612 ' (1) ·
'97 TH STREET ' (1) ·
'ARMONE PLACE ' (1) ·
'CONGRESS AVE NB ' (1) ·
'CONGRESS AVE SB ' (1) ·
'Congress Ave. ' (1) ·
'Cow Creek Road ' (1) ·
'CR 613 (58TH AVE) ' (1) ·
'CR-510 WABASSO RD ' (1) ·
'ELLISON WILSON RD ' (1) ·
'Hunting Camp Road ' (1) ·
'RANGE LINERD CR609' (1) ·
'Samsula Drive ' (1) ·
'Walter Boardman Ln' (1)
794126 (1) ·
794130 (1) ·
794184 (1) ·
794185 (1) ·
880044 (1) ·
884003 (1) ·
884023 (1) ·
884024 (1) ·
884055 (1) ·
930163 (1) ·
934131 (1) ·
934489 (1) ·
934930 (1) ·
934931 (1) ·
934932 (1) ·
934933 (1) ·
940026 (1)
'0.2 MI S OF LAKE IDA ROAD' (1) ·
'0.2MI S OF LAKE IDA ROAD ' (1) ·
'0.4MI N OF 49TH ST. ' (1) ·
'0.5Mi South of 6th Ave S ' (1) ·
'0.6 Mile South of SR-442 ' (1) ·
'0.8 MI N OF LAKE IDA ROAD' (1) ·
'0.9 mi E of Old Dixie Hwy' (1) ·
'1.0 mi. S of SR-44 ' (1) ·
'1.3 miles South of SR-44 ' (1) ·
'1.3MI N OF PGA BLVD ' (1) ·
'3.2MI W OF US-1 ' (1) ·
'AT 141st ST ' (1) ·
'AT 4TH STREET ' (1) ·
'AT 74TH AVE. ' (1) ·
'AT MARTIN COUNTY LINE ' (1) ·
'AT SR-7 US-441 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1)
Showing below up to 17 results in range #1 to #17.