Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Banana River ' (1) ·
'Banana River Relief ' (1) ·
'Belcher Canal (C-25) ' (1) ·
'Boca Inlet ' (1) ·
'BOYNTON CANAL C-16 ' (1) ·
'C-18 CANAL ' (1) ·
'CANAL C-24 ' (1) ·
'Canal L-14 ' (1) ·
'COUNTY LINE CANAL C-23 ' (1) ·
'Gatlin Blvd ' (1) ·
'Intracoastal Waterway ' (1) ·
'PARK LATERAL CANAL ' (1) ·
'SR-406 ' (1) ·
'Sykes Creek ' (1) ·
'Ten Mile Creek ' (1)
'97 TH STREET ' (1) ·
'A1A ' (1) ·
'CONGRESS AVE ' (1) ·
'Congress Ave. ' (1) ·
'I-95 NB ' (1) ·
'I-95 SB ' (1) ·
'Kings Highway ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'RANGE LINERD CR609' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SOUTH BEND BLVD. ' (1) ·
'SR-528 ' (1) ·
'SR-786(PGA BLVD) ' (1) ·
'SR-A1A ' (1) ·
'WB PGA Blvd. ' (1)
700025 (1) ·
700027 (1) ·
700028 (1) ·
700059 (1) ·
700134 (1) ·
884003 (1) ·
930060 (1) ·
930163 (1) ·
930349 (1) ·
930356 (1) ·
934491 (1) ·
940007 (1) ·
940026 (1) ·
940045 (1) ·
940108 (1) ·
940109 (1) ·
940122 (1) ·
940123 (1) ·
945251 (1)
'.5 miles South of SR-70 ' (1) ·
'0.2MI S OF FLORESTA DR ' (1) ·
'0.5Mi South of 6th Ave S ' (1) ·
'0.7MI W OF SR-401 ' (1) ·
'0.8Mi NORTH OF CR-804 ' (1) ·
'1.2 mi N Broward Cnty ' (1) ·
'1.5mi. N of SR-68 ' (1) ·
'1000'W of SR5 & E ofSR811' (1) ·
'2.85 Miles East of SR-3 ' (1) ·
'200' East of US-1(SR-5) ' (1) ·
'4.3 m N of Martin Co Line' (1) ·
'AT 141st ST ' (1) ·
'AT MARTIN COUNTY LINE ' (1) ·
'I-95 NB over SR-406 ' (1) ·
'I-95 SB over SR-406 ' (1) ·
'PGA Blvd 2.3mi. W of TPK.' (1) ·
'SR-528 WB - Sykes Creek ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required to protect exposed foundations (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 19 results in range #1 to #19.