Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BOYNTON CANAL C-16 ' (1) ·
'C-51 Canal ' (1) ·
'CORAL GARDENS OUTFALL ' (1) ·
'E-3 CANAL ' (1) ·
'H-20 CANAL ' (1) ·
'Indian River Relief ' (1) ·
'LATERAL CANAL D ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'PARK LATERAL CANAL ' (1) ·
'RELIEF CANAL ' (1) ·
'SFC DIST CANAL NO 1 ' (1) ·
'WEST PALM BEACH CANAL ' (1) ·
'WILLOUGHBY CREEK ' (1)
'74TH AVE. ' (1) ·
'97 TH STREET ' (1) ·
'AVENUE OF PGA ' (1) ·
'BISCAYNE DRIVE ' (1) ·
'CONGRESS AVE ' (1) ·
'ELLISON WILSON RD ' (1) ·
'HARRIS RD ' (1) ·
'HICKORY DRIVE ' (1) ·
'HURON WAY ' (1) ·
'LARCH AVE ' (1) ·
'LAWRENCE ROAD ' (1) ·
'NEW ENGLAND BLVD ' (1) ·
'NORFOLK BLVD. ' (1) ·
'SE ST LUCIE BLVD ' (1) ·
'Service Road ' (1)
704048 (1) ·
884003 (1) ·
884023 (1) ·
890102 (1) ·
894047 (1) ·
894048 (1) ·
934131 (1) ·
934259 (1) ·
934515 (1) ·
934517 (1) ·
934904 (1) ·
934914 (1) ·
935750 (1) ·
937005 (1) ·
937006 (1) ·
937007 (1)
'0.1 MI S of PGA BLVD ' (1) ·
'0.1Mi E of ONTARIO DRIVE ' (1) ·
'0.1MI E OF US-441 SR-7 ' (1) ·
'0.1MI W OF MILITARY TRAIL' (1) ·
'0.1MI. E of KANNER HWY ' (1) ·
'0.2 MI SOUTH OF 45TH ST ' (1) ·
'0.2 mile East of US-1 ' (1) ·
'0.4 mi N. of SR-80 ' (1) ·
'0.5 MI W OF HAVERHILL RD ' (1) ·
'0.8Mi N OF BOYNTON BCH B ' (1) ·
'1.3MI N OF PGA BLVD ' (1) ·
'1/2MI S of INDIAN ST. ' (1) ·
'AT 141st ST ' (1) ·
'AT 4TH STREET ' (1) ·
'AT TEDDAR ROAD ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 16 results in range #1 to #16.