Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
790173 (1) ·
880018 (1) ·
880019 (1) ·
880106 (1) ·
884022 (1) ·
935002 (1) ·
935204 (1) ·
935205 (1) ·
935206 (1) ·
935207 (1) ·
935209 (1) ·
935210 (1) ·
936551 (1) ·
940043 (1)
'0.03Mi E of CYPRESS WAY ' (1) ·
'0.1MI E of SW 9TH AVE ' (1) ·
'0.1MI S of CAMINO GARDEN ' (1) ·
'0.2 MILE E OF SW 9TH AVE ' (1) ·
'0.2MI E OF PROSPERITY FM ' (1) ·
'0.2MI S of CAMINO GARDEN ' (1) ·
'0.6MI N OF ANGLE ROAD ' (1) ·
'0.7 MILE NORTH OF SR-60 ' (1) ·
'0.75 mi. E. of I-95 ' (1) ·
'150FT S OF N CNTRY CLBDR ' (1) ·
'1MI NORTH OF SR-60 ' (1) ·
'AT 74TH AVE. ' (1) ·
'SR-60 East of 66 Ave ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)